Laserfiche WebLink
EXHIBIT B <br /> COST ESTIMATE-HOLLOW STEM AUGER <br /> Diesel Performance, Inc <br /> Stockton, Calsforrua <br /> TASK 1 WORKPLAN/SITE SAFETY PLAN AND PEFMTTING <br /> Labor $ 660 <br /> 1 hr Registered Geologist @$95/hr <br /> 8 hrs Staff Geologist @$65/hr <br /> 1 hrs draftsman @$45/hr <br /> Permit Fees 103 <br /> Expenses 50 <br /> Subtotal: $ 813 <br /> TASK 2 SUBSURFACE ASSESSMENT <br /> Labor $ 940 <br /> 2 hr Sensor Geologist @$80/hr <br /> 12 hr Staff Geologist @$65/hr <br /> Drilling Contractor(Hollow Stem Auger) 2,070 <br /> Field Expenses(PID, msleage, etc) 200 <br /> Laboratory Analyses <br /> Soil Standard TAT(6 TPHg/BTEX/MTBE @$63 25/ea) 380 <br /> Soil Standard TAT(6 TPHd and TPHk @$52 00/ea) 312 <br /> Subtotal: $ 3,902 <br /> TASK 3 SUMMARY REPORT <br /> Labor $ 865 <br /> 1 hr Registered Geologist @$95/hr <br /> 2 hrs Senior Geologist @$80/hr <br /> 8 hrs Staff Geologist @ $65/hr <br /> 2 hrs draftsman @$45/hr <br /> Expenses 50 <br /> Subtotal: $ 915 <br /> TOTAL ESTIMATED BUDGET: $ 5,630 <br /> Note If groundwater is encountered in the borings, one sample per boring will be collected and <br /> analyzed for the above constituents of concern for a cost of$250 per sample <br /> proposaUteeet <br />