Laserfiche WebLink
F�tn rnent LrGt <br /> • VES Trailer <br /> • Generator ( UR) <br /> • Vapor well connections 2" <br /> ' 0 Magnehelic gauges - set <br /> • PID/CVA (Inova) <br /> • Air sample pump <br /> • Water level indicator <br /> • Well caps with monitoring ports <br /> ' Materials List <br /> ' • Sample bottles <br /> • Summa canisters <br /> • Bailers <br /> ' Gloves <br /> • Vacuum, PSI, and temperature gauges <br /> • Pitot tube with fittings, anemometer <br /> ' • Misc piping and connectors, flexible piping <br /> VAPOR EXTRACTION TEST <br /> On April 11, 2005 Alex and Charlie will mobilize to the rt <br /> P site in the morning <br /> ' Take barricades and traffic cones <br /> March 14 2005 <br /> ' Pre-test Procedures <br /> ' • Measure depth-to-water in extraction well (MW2) and all observation wells (VWE1, <br /> VWE2, MW1, 3 &4) <br /> • At extraction wellhead MW2, install PVC riser and all piping to connect to VES trailer <br /> ' • Install pitot tube, gauges, temperature gauge, etc for monitoring influent stream <br /> • Install monitoring caps on all observation wells, hookup magnehelnc gauges set to zero <br /> • Record vacuum or pressure readings at all moritoring points prior to testing <br /> ' Collect GW sample prior to start VET <br /> AlexF Dieselvet doc <br /> 1 <br />