Laserfiche WebLink
.. `USAN JOAQUIN COUNTY <br /> Pf FSLIC HEALTH SERVICES <br /> ENVIRONMENTAL HEALTH DIVISION <br /> P. 0. BOX 2009, STOCKTON,CA 95021 <br /> WGROUNDWATER <br /> LIE:111:11 ffApproved <br /> 10TECHNOLOGY, INC. 1401 v t 40 est rament CA 69 9 1372-4700 <br /> FAX(916)372-8781 <br /> March 17, 1993 0 Disapproved; S6 02070 3885 <br /> 47kQ WOW <br /> Remarks S <br /> Mr. Brett L Hunter <br /> Chevron U.S.A. Products Company f�� q <br /> 2410 Camino Ramon Date By <br /> San Ramon, CA 94583-0804 Approval of these pians extends only to that <br /> which is shown and described here-6n but <br /> RE: WORK PLAN FOR SOIL AND GROUNDWATER ���Qlq;-2µthorize or approve any omission <br /> FORMER CHEVRON SERVICE STATION # 9-77 of requirements of State laws or <br /> 3248 EAST FREMONT STREET tal Ordinances. <br /> STOCKTON, CALIFORNIA �} .Soil �*V-lr\qS, S192 co � Shoo <br /> ms+md ae P weF wens <br /> 2) sa3 shouLA be ItC� <br /> Dear Mr. Hunter: -LK9 Pump ,stay,d. <br /> 3) Pit tn. 5hWlA W t0wkd US�r CU <br /> In response to your request, Groundwater Technology, Inc. has prepared ti soil and groundwater b0,C,K- OQ/ <br /> assessment work pian for the above-referenced site to fulfill the requirements of the San Joaquin <br /> County Public Health Services (SJCPHS). The scope of work consists of the drilling of soil borings, <br /> installation of temporary groundwater monitoring wells, soil and groundwater sampling, laboratory <br /> analyses, and report preparation. 4) Sol\ av)c1�6t5 Should p C <br /> fouowty� Gott sar►�p�S 4 MvJvr►UMv <br /> s132- every 5'to 11+z.0 kxgt"" 5115' <br /> SB 3 <br /> 5',ZDV-t 0, 90, O <br /> TASK 1: SITE-SPECIFIC HEALTH AND SAFETY PLAN / BACKGROUND REVIEW/ tiV15�1(XJ <br /> PERMITTING 5) R11 P1%i5t r1e� <br /> movu� v�-t Via, LOW U <br /> scu'r+ qu <br /> A Site-Specific Health and Safety Plan will be prepared by Groundwater Technology as required b <br /> the Occupational Health and Safety Administration (OSHA) Standard "Hazardous Waste Operations <br /> and Emergency Response" guidelines (29 CFR 1910.120). The Site-Specific Health and Safety Plan <br /> will be prepared by Groundwater Technology personnel, following a complete review of site <br /> conditions and any existing Site-Specific Health and Safety Plans for the site with the project <br /> manager. The document will be reviewed and signed by all Groundwater Technology personnel and <br /> subcontractors performing work at the site. <br /> Groundwater Technology will conduct a technical review of all pertinent information associated with <br /> the site. All applicable local and State permits pertaining to the proposed work will be obtained. <br /> Offices thmuohout the U.S..Canada and Overseas <br />