Laserfiche WebLink
•-,� CONTENTS <br /> P <br /> 1 <br /> 1. INTRODUCTION <br /> i <br /> 1.1 Site Description 1 <br /> 1.2 Site History <br /> 2 <br /> 2. PREVIOUS INVESTIGATIONS <br /> 2 <br /> 2.1 Tank Removal and Soil Sampling 2 <br /> 2.2 Installation of Monitoring Wells 2 <br /> 2.3 Domestic Well Search and Sampling 3 <br /> 2.4 EA Monitoring Well Installation 3 <br /> 2.5 Quarterly Groundwater Monitoring <br /> 4 <br /> 3. PRESENT INVESTIGATION <br /> 4 <br /> 3.1 Borehole Drilling 4 <br /> 3,2 Soil Sampling 4 <br /> 3.3 Groundwater Monitoring Wel!Installation 5 <br /> 3.4 Well Development 5 <br /> 3.5 Well Destruction 5 <br /> 3.6 Well Survey 5 <br /> 3.7 Groundwater Sampling <br /> b <br /> 4. STTE^o:mr-r[ONS <br /> b <br /> 4.1 Hydrogeology 6 <br /> 4.2 Soil Sample Analyses 6 <br /> 4.3 Groundwater Sample Analyscs <br /> 7 <br /> 5. SUMMARY <br /> 8 <br /> 6. CONCLUSIONS <br /> 9 <br /> 7. REFERENCES <br /> APPENDIX A: 1987 GTI Well Logs, 1988 EA Well Logs <br /> APPENDIX B: Well Permit 90-1963 <br /> APPENDIX C. ProtoccosS fo Well Drilling,Completion,Development,and Sampling <br /> APPENDIX D: Wel g ms for EAS and EA6 <br /> APPENDIX E: Completion Diagra <br /> APPENDIX F: Well Purging and Sampling Field Notes <br /> APPENDIX G: Laboratory Reports <br />