ti <br /> 5. SCHEDULE <br /> EA can begin borehole drilling within two weeks of receiving <br /> authorization from Chevron and San Joaquin Public Health, <br /> assuming driller availability. <br /> It is anticipated than the wells will take three days to install. <br /> The wells will be developed two to three days after completion, <br /> prior to well sampling. Sampling of the new wells and the off- <br /> site water supply wells will require one day. Laboratory <br /> analysis will require two weeks after receipt of samples. The <br /> final repor4 will be delivered three weeks after the sample <br /> results are received from the laboratory. <br /> �� c5l /97780/6-90/tx 13 <br />