My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011484
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
3246
>
3500 - Local Oversight Program
>
PR0545174
>
ARCHIVED REPORTS_XR0011484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 3:24:25 PM
Creation date
1/13/2020 2:40:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011484
RECORD_ID
PR0545174
PE
3528
FACILITY_ID
FA0004965
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
3246
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14341001
CURRENT_STATUS
02
SITE_LOCATION
3246 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUNDWATER TECHNOLOGY <br /> STANDARD OPERATING PROCEDURE <br /> r CONCERNING SOIL SAMPLING METHODOLOGY <br /> SOF 14 <br /> Soil samples should be collected and preserved in <br /> accordance with Groundwater Technology Laboratory's <br /> Standard Operating Procedure (GTL OOP 15) concerning <br /> Soil Sample Cnllection and Handling when Sampling for <br /> Volatile organics. A hollow stem soil auger should be <br /> used to drill to the desired sampling depth. A standard <br /> 2 inch diameter split spoon sampler 18 inches in length <br /> shall be used to collect the samples. The samples are <br /> contained in 2 inch diameter by 6 inch long thin walled <br /> brass tube liners f.'.tted into the split spoon sampler <br /> (three per sampler' . <br /> The split spoon sampler should be. driven the full depth <br /> _ of the spoon into the soil using a 140 pound hammer. <br /> The spoon shall then be extracted from the borehole and <br /> the brass tube liners containing the soil sample removed <br /> from the sampler. The ends of the liner tubes should be <br /> immediately covered with aluminum foil, sealed with a <br /> teflon or plastic cap, and then taped with duct tape. <br /> After being properly iden¢itied with sample data entered <br /> on a standard chain of custody form the samples shall be <br /> placed an dry ice (maintained below 4°C) and transported <br /> to the laboratory within 21 hours. <br /> One of the three soil samples retrieved at each sample <br /> depth shall be analyzed in the field using a phot:oioni- <br /> ► � nation detector and/or explosimeter. The purpose of the <br /> field analysis is to provide a means to choose samples <br /> to be laboratory analyzed for hydrocarbon concentrations <br /> and to enable comparisons between the field and labor- <br /> atory analyses. She soil sample shall be sealed in <br /> r a plastic bag and placed in the sun to accelerate the <br /> vaporization of volatile hydrocarbons from the soil. One <br /> , n of the two field vapor instruments shall be used to <br /> quantify the amount of hydrocarbon released to the air <br /> from the soils. The data shall be recorded on the drill <br /> logs at the depth corresponding to the semple point. <br /> n.w <br />
The URL can be used to link to this page
Your browser does not support the video tag.