My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4100
>
2900 - Site Mitigation Program
>
PR0506616
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 4:30:37 PM
Creation date
1/13/2020 3:56:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506616
PE
2950
FACILITY_ID
FA0007543
FACILITY_NAME
GREWALS MARKET
STREET_NUMBER
4100
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14333046
CURRENT_STATUS
02
SITE_LOCATION
4100 E FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 29 April 1997 <br /> AGE-NC Project No. 97-0327 <br /> Page 3 of 7 <br /> Location Job Function Levels of Protection <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C., D Other <br /> and log borings <br /> Support Zone Support functions A B C' D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> Level D: hard hat <br /> 4 <br /> steel-toed boots <br /> half-faced respirator (if necessary) <br /> gloves <br /> safety lasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for <br /> use with the involved substances and concentrations. No changes of the specified levels of <br /> protection shall be made without the approval of the site safety officer and the project team <br /> leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(les) consisting of two persons will perform the following tasks: <br /> Project Team Leader: Task: <br /> Tim Cuellar Over site <br /> Work Party #1: Task: <br /> Geo Probe Operator Advance borings <br /> Technician if nec. Clean equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.