Laserfiche WebLink
07/12/08 13:45 00916 372_0911 FILLNER CDNSTHU(c <br /> 20 CLOSURE PROCEDURE-!REMOVAL OF TANKS <br /> SAN JOAQUIN COUNTYiDEPARTMENT OF ENVIRONMENTAL HEALTH TANK CLOSURE <br /> GUIDELINES AND SOIL OND GROUNDWATER SAMPLING GUIDELINES SHALL BE � <br /> FOLLOWED,EXCEPT MERE THE FOLLOWING SPECIFICATIONS ARE MORE <br /> RESTRICTIVE. <br /> REMOVE ALL PRODUCT FROM TANKS. <br /> REMOVE ALL RESIDUAL LIQUID,SOLIDS;OR SLUDGES. <br /> I <br /> PURGE ALL VAPORS FROM GAS TANKS WITH A MINIMUM OF THIRTY(30)POUNDS OF <br /> SOLID CARBON DLOX16E'(DRY ICE) FOR EACH 1,000 GALLONS OF TALK CAPACITY. FOR t <br /> DIESEL,A MINIUM OF 45LBS SOLID CARBON DIOXIDE(DRY ICE)PER 1000 GAL OF TANK <br /> CAPACITY AND PRESENT'SALES SLIPS TO INSPECTOR. PELLETIZED DRY ICE IS <br /> RECOMMENDED.CAP ALL OPENINGS EXCEPT VENT PIPE AND ALLOW TWO HOUR <br />' MINIMUM AND SIX HOUR'MAXMMUM FOR OXYGEN DISPLACEMENT AFTER PUTTING <br /> CARBON DIOXIDE INTO THE TANKS. VENT PIPE OPENING TO BE CHECKED WITH A <br /> COMBUSTIBLE GAS DETECTOR TO DETERMINE IF TANK 15 VAPOR FREE OR IF <br /> ADDITIONAL DRY ICE ANDIOR TIME MAY BE REQUIRED. <br /> PLUG OR CAP ALL TANK OPENINGS LEAVING A 118"»114"PRESSURE RELIEF HOLE IN <br /> ONE CAP ATTHE TOP OF THE TANK <br /> VISUALLY INSPECT THE TANKS UPONREMOVALALL EXTERNAL TANK SURFACES <br /> AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES OR LEAKAGE. THE <br /> RESULTS OF SUCH INSPECTION SHALL BE DOCUMENTED IN WRITING,WITH <br /> PHOTOGRAPHS WHERE APPROPRIATE. PATCH ANY HOLES WITH APPROVED <br /> MATERIAL BEFORE TRANSPORT NG TANKS TO DISPOSAL SITE. <br /> SOIL SAMPUNG SHALL SE CONDUCTED IN ACCORDANCE WITH THE LUFT MANUAL. <br /> i <br /> TWO SOIL SAMPLES SHALL BE ANALYZED FROM BENEATH EACH TANK- ONE FROM i <br /> DIRECTLY BENEATH THE FILL PIPE THE OTHER FROM A SIMILAR POSITION AT THE <br /> OPPOSITE END OF THE TANK. IF OBVIOUSLY STAINED OR CONTAMINATED AREAS <br /> EXIST IN LOCA71ONS OTHER THAN THE ABOVE LOCATIONS,and THEN ADDITIONAL SOIL <br /> SAMPLES SHALL BE ANALYZED FROM THESE OBVIOUSLY STAINED OR CONTAMINATED <br /> AREAS. <br /> . S <br /> SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR JUST BELOW <br /> THE INTERFACE OF TIJ SACKFI L WITH THE NATIVE SOIL SAMPLES SHALL 13E TAKEN <br /> USING A DRIVEN TUBE TYPE SAMPLER, CAPPED AND SEALED WITH INERT MATERIALS. <br /> FORMAL,SIGNED CHAIN-OF-CUSTODY RECORDS SMALL BE MAINTAINED FOR EACH <br /> SAMPLE AND SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. i <br /> IF THE BOTTOM OF THE TANK IS BELOW THE GROUNDWATER TABLE,THEN SOIL <br /> SAMPLES ARE NOT REQUIRED. IN THIS CASE,A WATER SAMPLE SHALL BE COLLECTED <br /> AS SOON AS POSSIBLE FROM THE SURFACE OF THE GROUNDWATER IN THE <br /> EXCAVATION, A CHECK'SHALL INITIALLY Be MADE FOR ANY FREE=FLOATING <br /> PRODUCTS. IF NO FLOATING PRODUCT IS DETECTED,THEN A WATER SAMPLE SHALL <br /> BE TAKEN WITH A DEVICE DESIGNED TO DEDUCE THE LOSS OF VOLATILE <br /> COMPONENTS. A BAILER IS A SUITABLE SAMPLING DEVICE. THE WATER SAMPLE i <br /> SHALL BE IMMEDIATELY POURED INTO A VOLATILE ORbANIC ANALYSIS(VOA)VIAL <br /> WITH AS LITTLE AGITATION AS POSSIBLE A TEFLON SEPTUM SHALL BE USED TO SEAL i <br /> THIS VIAL_ <br /> SOIL AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL HYDROCAR13ONS BY <br /> THE METHODS OUTLINED IN AGUIDEL.INeS FOR ADDRESSING FUEL LEAKS- <br /> 2 <br /> I <br /> I <br />