Laserfiche WebLink
p7/12/98 13:05 $916 372 0911 <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, SAKI FRANCISCO HAY <br /> REGION—SEPTEMBER 9;85 <br /> I <br /> LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE ON SAME DAY <br /> AS RE E VAL. THE CARRIER WILL SEA LICENSED WASTE HAULER AND MANIFESTS <br /> 1f1dILLACCOMPANY THE TANKS. i <br /> 3.Q REMOVAL OF PIPING <br /> PIPING TO HE REMOVE&SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO REMOVAL <br /> PIPING SHALL HE STOCKPILED ON-SITE PRIOR TO DISPOSAL <br /> I <br /> VISUALLY INSPECT PIPE,TRENCH FOR INDICATION OF LEAKAGE. A SOIL SAMPLE <br /> SHALL BE TAKEN AND ANALYTED FOR EACH TWENTY LINEAL FEET OF TRENCH IF <br /> INSPECTION OF TRENCH, REVEALS EVIDENCE OF LEAKAGE. FOLLOW PROCEDURE <br /> LISTED IN SECTION 2.1 FOR SAMPUNG AND ANALYSIS. <br /> I <br /> I <br /> 5 <br /> I <br /> 1 <br /> I <br /> 1 <br /> 3 <br /> I � <br /> i <br />