My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4100
>
3500 - Local Oversight Program
>
PR0545177
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 5:34:26 PM
Creation date
1/13/2020 4:05:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545177
PE
3528
FACILITY_ID
FA0002123
FACILITY_NAME
GREWALS GAS & LIQUOR*
STREET_NUMBER
4100
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14333046
CURRENT_STATUS
02
SITE_LOCATION
4100 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05 December 2007 <br /> AGE-NC Project No. 97-0327 <br /> Page 6 of S <br /> All sampling tools and brass sleeves used for sample collection will be thoroughly rinsed with clean <br /> water after washing with a solution of Alconox. All hollow stem augers will be steam-cleaned prior <br /> to advancement in each borehole. <br /> 3.3. WELL COMPLETION <br /> Soil boring MW-5 will be completed as a ground water monitoring well utilizing 2-inch diameter <br /> schedule 40 polyvinylchloride (PVC} 0.020-inch slotted well screen and blank well casing. Based <br /> on geologic/hydrogeologic conditions, a 20-foot length of well screen is anticipated for installation <br /> of ground water monitoring well MW-5; a proposed well construction diagram is depicted in <br /> Figure 3. <br /> After installing the well casing, filter pack material consisting of pre-washed #2112 Monterey sand <br /> will be added from the bottom of the borehole to approximately two feet above the screened interval. <br /> Following placement of the filter pack, the well will be surged to assist in settling the filter pack. <br /> Additional sand will be added if settling occurs. <br /> A nominal three-foot transition seal (bentonite pellets) will be placed above the filter pack to <br /> minimize the potential for grout penetration into the screened section of the well. The bentonite seal <br /> will be formed by pouring bentonite pellets into the annulus and allowing them to settle on the filter <br /> pack. The bentonite chips will be allowed to hydrate a minimum of one-half hour prior to grouting. <br /> The remaining annular space will be filled to within 1 foot of the ground surface with a cement grout <br /> seal. The grout mixture will consist of Type 1/I1 portland neat cement and not more than 6 gallons <br /> of water per 94-pound sack of cement. The grout will be placed by pumping through tremmie pipe. <br /> A grouting inspection will be scheduled with SJCEI-1D personnel. A traffic-rated well box will be <br /> installed over the top of the well casing. <br /> 3.4. WELL DEVELOPMENT <br /> Development of the proposed well will consist of a combination of bailing with a stainless steel <br /> bailer to remove the major portion of fine-grained sediment from inside the well, surging to flush <br /> out or draw in sediment from the filter pack and additional ground water evacuation{purging) with <br /> a submersible pump to finish the removal of fine-grained sediment.Developmental purging activities <br /> will be continued until field parameter(pH,electrical conductivity, and temperature)readings have <br /> stabilized and purged water is visually sediment-free. <br /> Advanced GeoEmironmentai,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.