Laserfiche WebLink
1 Case Closure Summary Page } <br /> Baking Underground Fuel Storage Tank Prram <br /> III Release and Site Characterization.Information (continued) <br /> Maximum Documented Contaminant Concentrations -- Before and After Cleanup <br /> R <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH (Gas) 1,600 NA 0.490 <0.050 Ethylbenzene 32 NA 0.005 <0.0005 <br /> TPH(Diesel) 11,000 NA 0.270 <0.050 Xylenes 210 NA 0.0083 <0.0006 <br /> Benzene <0.5 NA 0.0062 <0.0005 MTBE <0.5 NA 0.010 0.012 <br /> Toluene 7.6 NA <0.0005 <0.0005 1.2 DCA NA NA . 0.0068 <0.0005 i <br /> Heavy metals 1 19 (Pb) I NA I NA I NA <br /> Comments: Soil Before analytical data are taken from sample T1-A; Soil After data are not available since confirmation <br /> samples were not collected. Water Before analytical data are taken from MW-2 on 8/31100; Water After analytical data are <br /> taken from MW-2 on 11112/08. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan? Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? Yes <br /> Does corrective action protect public health for current land use? Yes <br /> Site management requirements: None 1 <br /> E <br /> Should corrective action be reviewed if land usechanges? Yes <br /> Monitoring/Vapor wells decommissioned: Yes Number Decommissioned: 4 Number retained: 0 <br /> List enforcement actions taken: NOR <br /> List enforcement actions rescinded: None } <br /> V. Local Agency Representative Data <br /> Name: Donna Heran, REHS Title: Director <br /> Signature: Date: �d I <br /> VI. Central Valley Regional Water Quality Control Board (RB) Notification I <br /> Date Submitted to RB: March 4, 2011 Response Date: March 10, 2011 <br /> RB Staff: James L.L. Barton_ Response:_Concurrence _ <br /> Title: Associate Engineering Geologist <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER,Shall be retained by the lead agency as part of the official <br /> site file. <br />