My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011418
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4100
>
3500 - Local Oversight Program
>
PR0545177
>
ARCHIVED REPORTS_XR0011418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 5:25:08 PM
Creation date
1/13/2020 4:12:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011418
RECORD_ID
PR0545177
PE
3528
FACILITY_ID
FA0002123
FACILITY_NAME
GREWALS GAS & LIQUOR*
STREET_NUMBER
4100
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14333046
CURRENT_STATUS
02
SITE_LOCATION
4100 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 17 October 2005 <br /> . AGE-NC Project No. 97-0327 <br /> Page 4 of 4 <br /> ' The fuel additive 1,2-DCA was the only analyte detected in this ground water sampling <br /> event, at a concentration of 12 µg/1 in ground water sample MW-4. <br /> 5.0. RECOMMENDATIONS <br /> ' Based upon data collected during the second quarter 2005, AGE recommends: <br /> • Continued utilization of wells MW-1 through MW-4 for quarterly ground water monitoring <br /> and sampling.The next quarterly ground water monitoring event is tentatively scheduled for <br /> July 2005. <br /> ' A site conceptual model(dated 29 March 2004)was previously submitted to EHD and recommended <br /> that at least two additional soil borings be advanced in a south section of the site utilizing cone <br /> 1 penetrometer testing (CPT) technology. In a letter dated 15 September 2005, the EHD concurred <br /> with AGE's recommendation for the CPT soil borings,and directed that a CPT soil boring work plan <br /> be submitted for EHD review by 01 November 2005.Therefore,a work plan addressing on-site CPT <br /> ' . soil borings is forthcoming and will be submitted by 01 November 2005. Upon EHD-approval of <br /> the work plan, AGE will submit an application to EHD for drilling permit, and schedule all field <br /> work. <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings were based upon <br /> analytical results provided by an independent laboratory.Evaluation ofthe hydro geologic conditions <br /> at the site for the purpose of this investigation was made from review of previous consultants reports <br /> and a limited number of available data points(ground water samples)and subsurface conditions may <br /> vary away from these data points. No other warranty, expressed or.implied, is made as to the <br /> professional interpretations, opinions and recommendations contained in this report. <br /> Advanced CeoEnwironmentel,Inc. <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.