My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5709
>
2900 - Site Mitigation Program
>
PR0523858
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 4:20:56 PM
Creation date
1/14/2020 3:34:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523858
PE
2960
FACILITY_ID
FA0016067
FACILITY_NAME
FORMER BUFFALO TANK
STREET_NUMBER
5709
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
10123019
CURRENT_STATUS
01
SITE_LOCATION
5709 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Site Assessment Work Plan <br /> • FORMER BUFFALO TANK CORPORATION <br /> 5709 East Fremont Street, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. REGIONAL GEOLOGIC/HYDROGEOLOGIC CONDITIONS . . . . . . . . . . . . . 1 <br /> 2.2. UNDERGROUND STORAGE TANK REMOVAL . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2.3. PREVIOUS SITE ASSESSMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES . . . . . . . . . . . . . . . . . . . 3 <br /> 3.2. DRILLING AND SOIL SAMPLE COLLECTION . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.3. MONITORING WELL INSTALLATION, DEVELOPMENT AND SURVEY . 4 <br /> 3.4. GROUND WATER SAMPLING AND ANALYSIS . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.5. PREPARATION OF REPORT OF FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> • 4.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 4.1. SOIL BORING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 4.2. WELL COMPLETION AND WELL ELEVATION SURVEY . . . . . . . . . . . . . . 6 <br /> 4.3. WELL DEVELOPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 , <br /> 4.4. GROUNDWATER SAMPLING PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4.1. Static Water Level Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4.2. Well Evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4.3. Sample Withdrawal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4.4. Sample Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT . . . . . . . . . . 8 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2-Site Plan <br /> Figure 3 - Concentration of Dissolved TPH-g in Ground Water <br /> TABLES <br /> Table 1 -Analytical Results of Soil Samples <br /> APPENDICES <br /> • Appendix A- Cal fornia Regional Water Quality Board Letter <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.