My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5709
>
2900 - Site Mitigation Program
>
PR0523858
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 4:20:56 PM
Creation date
1/14/2020 3:34:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523858
PE
2960
FACILITY_ID
FA0016067
FACILITY_NAME
FORMER BUFFALO TANK
STREET_NUMBER
5709
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
10123019
CURRENT_STATUS
01
SITE_LOCATION
5709 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06 April 2005 <br /> AGE-NC Project No. 04-1139 <br /> Page 3 of 7 <br /> designated for the applicable work areas or task: <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Excavation Area A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized,organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Donna Sexton Collect soil and water samples; direct drilling <br /> FIELD CREW: TASK: <br /> Driller Advance borings <br /> Field Technician (if nec.) Clean equipment <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> Advanced GcoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.