Laserfiche WebLink
Mr Michael J. Infurna Jr. P.G., S.R.E.H.S. <br /> August 2, 2006 <br /> Page 8 <br /> further reduces the leaching potential of hydrocarbons from shallow soils into the <br /> groundwater. <br /> LIMITATIONS <br /> This report presents our -understanding of existing conditions at the subject.site. The <br /> conclusions contained herein are based on the analytical results and professional <br /> judgment, which are in accordance with current standards of professional practice; no other <br /> warranty is expressed or implied. SECOR assumes no responsibility for data reported by <br /> other consultants or contractors. . <br /> Please call the undersigned at (916) 384-0768 with any questions regarding this report. <br /> Sincerely, <br /> SECOR International, Incorporated <br /> Bryan Rorie <br /> Staff Geologist <br /> Gary D. Haeck, Ph.D., P.G. <br /> Senior Geologist <br /> Figures: Figure 1 — Site Location Map <br /> Figure 2— Site Plan - <br /> Figure 3 — Boring Location Map <br /> Table: Table 1 — Soil and Groundwater Analytical Results <br /> Attachments: Attachment 1 — Boring/Well Permit <br /> Attachment 2— Certified Laboratory Analytical Report and Chain-of- <br /> Custody Form <br /> Attachment 3 —Water Sample Field data Sheet <br /> cc: Mr. Terry Winsor, PG&E <br /> CADocuments and Setfings\minfurna\Local Settings\Temporary Internet Files\0LK6F\Final PGE French Camp 2nd Phase II.doc <br />