Laserfiche WebLink
TABLE 1 <br /> MONITORING WELL CONSTRUCTION DETAILS AND GROUNDWATER ELEVATIONS <br /> LPG&E French Camp General Construction Yard 401 East French Camp Road <br /> French Camp, California <br /> Well Total Screened Casing Casing Depth To Groundwater <br /> Number Depthm Intervallal Diameter(b) Elevation(c) Groundwater(d) Elevation(`) <br /> MW-1 34 19-34 2 19.37 05/07/07 28.01 -8.64 <br /> 11/13/07 .27.41 -8.04 <br /> 02/13/08 24.59 -5.22 <br /> 05/27/08 28.96 -9.59 <br /> MW-2 35 20-35 2 19.44 05/07/07 27.97 -8.53 <br /> 11/13/07 27.47 -8.03 <br /> 02/13/08 24.57 -5.13 <br /> 05/27/08 28.99 -9.55 <br /> MW-3 35 20-35 2 18.95 05/07/07 27.43 -8.48 <br /> 11/13/07 27.01 -8.06 <br /> 02/13/08 24.11 -5.16 <br /> 05/27/08 28.41 -9.46 <br /> Table Notes: <br /> (a) Measured in feet below ground surface. <br /> (b) Measured in inches. <br /> (c) Measured in feet relative to North American Vertical Datum(NAVD)88. <br /> r (d) Measured in feet below top of PVC casing. <br /> F.r <br /> tri <br /> Tables 1&2.xls/rable 1-Well Details Page 1.of 1 7/7/2008 <br />