Laserfiche WebLink
PROJECT:PG&E General Construction Yard WELL/PROBEHOLE/BOREHOLE NO: <br /> LOCATION:401 French Camp Road,French Camp,CA <br /> PROJECT NUMBER:185702138.200.003 60-3 PAGE 1 OF 1 sea. <br /> DRILLING/INSTALLATION: NORTHING(ft): EASTING(ft): <br /> STARTED 8114/09 COMPLETED: 8/14109 LAT: LONG: <br /> DRILLING COMPANY:Gregg Drilling GROUND ELEV(ft): TOC ELEV(ft): <br /> DRILLING EQUIPMENT:Geoprobe INITIAL DTW(ft):Not Encountered WELL DEPTH(ft):12.5 <br /> STATIC DTW(ft):Not Encountered BOREHOLE DEPTH(It):12.5 <br /> DRILLING METHOD:Direct Push WELL CASING DIA.(In);--- BOREHOLE DIA.(in):3 <br /> SAMPLING EQUIPMENT:Macro Core LOGGED Y•Bryan Rorie CHECKED BY:Nell Doran <br /> b <br /> m a i$' U Time 8" o 25 �o. Q` Borehole <br /> L-' to Sample ID m Co a p Backfill <br /> � m <br /> x <br /> AB Gravel <br /> Cemented <br /> well box <br /> Bentonite <br /> sanitary seal <br /> Fill from previous excavathn <br /> No.2/12 sane! <br /> 5 5 '. 1 inch sample <br /> !OW <br /> ML SANDY SILT;ML;by 312 dark olive gray;non <br /> plastic;stiff;dry;HC odor;(0,40,60,0) S13 050 7 191 1M/,4�-inin h <br /> tube <br /> SAA Bentonite seal <br /> SP SAND;SP;2.5Y 712 tight gray <br /> 10 % meduum-Tained;loose;dry;poly graded; 1055 10 <br /> 242 <br /> (0,100,0,0) SB-10A-10 <br /> 1105 :. 1 inch sample <br /> _ 5S pointhole teminat <br /> Borered at 12feet <br /> .5 .—————— SB-1 DA-12 No.2/12 sand <br /> 0 <br /> O <br /> a <br /> 20 20 <br /> c� <br /> 0 <br />