My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:08:21 PM
Creation date
1/14/2020 4:25:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> LlDISCUSSION IDEAS FOR THE DAILY PRODUCTION H&S MEETING <br /> ❑ Emergency response plan, emergency vehicle (full of fuel) and muster point <br /> Route to medical aid (hospital or other facility) <br /> ❑ Work hours, is night work planned? <br /> L ❑ Hand signals around heavy equipment <br /> 0 Traffic control <br /> 0 Pertinent Legislation and Regulations <br /> 0 Above and below ground utilities (energized or de-energized) <br /> ❑ Material Safety Data Sheets (MSDS) <br /> 0 To who, what, why, and when to report an incident <br /> ' 0 Fire extinguisher and first aid kit locations <br /> ❑ Excavations, trenching sloping and shoring <br /> L0 Personal protective equipment( PPE ) and training <br /> ❑ Safety equipment and training <br /> L ❑ Emergency telephone and telephone numbers (may not be 911) <br /> ❑ Eye wash stations and washroom locations <br /> L1 - <br /> ❑ Energy lock-out/tag-out procedures. Location of"kill Switches" etc. <br /> ❑ Weather restrictions <br /> L1 0 Site security. Site hazards. Is special waste present. <br /> ❑ Traffic and people movements <br /> El Working around machinery (both static and mobile) <br /> L El Sources of ignition, static electricity et . <br /> g y c <br /> L1 <br /> ❑ Stings, bites, large animals and other naturally related injuries <br /> - ❑ Working above grade <br /> L' 0 Working at isolated sites <br />�? El Decontamination procedures (both personnel and equipment) <br /> 0 Falls, trips, sprains and lifting injuries (how to.prevent) <br /> ❑ Right to refuse unsafe work <br /> r ❑ Adjacent property issues (residence, business, school, day care center) <br /> Lam_ - <br /> L <br /> PG&E SECOR International Incorporated <br /> SECOR Project No.OSOT-50234.00.0003 PG&E French Camp HASPB.doc <br /> 48 <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.