Laserfiche WebLink
Field staff must review job-specific workplan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including,but not limited to,permitting, <br /> access agreements,and notification to required contacts(e.g.site managers,inspectors,clients,subcontractors,etc.). A tailgate safety meeting must be performed and documented at the beginning of <br /> each workd . Plan,Prevent,Execute CPPE2 procedures must be used throughout the prqLect. Weather conditions(heat,cold,rain,li htniir )must also be considered. <br /> 0 Job Step,; OPer.%;oita[ProtectiieF.(itiipm(,)it 0 Potential Hazard 0 Critical Actions <br /> and park somewhere prior to retrieving sunglasses. <br /> POST-TRIP-Report Conditions worsen leading to <br /> maintenance or mechanical mechanical failure resulting in •Report vehicle problems immediately to company representative or rental car <br /> problems upon returning accident,injury or death. agency. <br /> vehicle. <br /> Task 2: The following table addresses the concerns of soil and groundwater sampling. This also includes advancement of soil borings and <br /> installation of wells. <br /> Field staff must review job-specific workplan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including,but not limited to,permitting,access <br /> agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each{ <br /> workday. Plan,Prevent,Execute procedures must be used throu hout the.project.- Weather conditions heat,cold,rain,1ightning lightningmust also be considered. <br /> 0 Job Steps 2 Personal Protective Equipment' ? Potential <br /> Visit Site and Identify and mark Wear reflective vest for traffic,steel Traffic hazards,overhead and <br /> drilling locations. toed and shank shoes,hardhat,safety underground installations,product Visit site and observe existing conditions. <br /> glasses with side shields,and leather releases,property damage,dealer •Reference Utility Clearance Review form(Attachment 4). <br /> gloves as necessary. inconvenience. <br /> •Coordinate with Site Manager(or designee)to minimize potential conflicts. <br /> •Check local building department,city and county agencies for maps and records of <br /> subsurface installations. <br /> •Review proposed locations against available construction drawings and known <br /> utilities,tanks,product lines,etc. <br /> •Mark out the proposed borehole locations. <br /> •Call underground utility locating service for public line location clearance and get <br /> list of utilities being contacted. <br /> 0 Coordinate private line locator for private property. <br /> •Develop a traffic guidance and control plan with the client and local agencies as <br /> applicable.Plan may include use of delineators,barrier tape,jersey barriers,snow <br /> fence,etc.(Refer to Attachment 2). <br /> 0 It is the responsibility of the SHSO to annotate the Site Plan with the Traffic <br /> Guidance and Control configuration if a formally developed Traffic Guidance <br /> and Control Plan is not available. <br /> -...____..._-.__...................._ <br /> .. ............_..........._..__..._..__._..__........__.........._.._._...._......--.--....--..._..... _... ......_....._ -._..._......_......__._...._...._.__......__...----------- <br /> _........ <br /> ---._....... <br /> .._............_...._.... <br /> Obtain sub-contractor equipment Improper equipment maintenance, <br /> •Verify records in possession are for equipment on site. <br /> maintenance records prior to which can cause equipment <br /> commencing work. failure and possible personal •Verify maintenance is current. <br /> __.1_...__.___.­_._ injurg. <br /> Determine Best Method of Selection of inappropriate • Available methods could include one or a combination of the following: 1) <br /> Utility/Subsurface Impediment clearance method resulting in magnetic surveys,2)ground-penetrating radar,3)hand-excavation by shovel, <br /> Clearance Method Based on Data __�— -- missed subsurface impediment,or <br /> .. ....... ................. ... .__......__................................_ ..........-......... . ..... . ...... .. . ..._......_......_............................._.__......_......._........._.........................................._.... <br /> PG&E SECOR International Incorporated <br /> SECOR Project No.050T.50234.00.0003 PG&E French Camp <br /> HASPB.doc <br /> 17 <br />