Laserfiche WebLink
ATTACHMENT 5a <br /> EQUIPMENT CALIBRATION/CHECK LOG <br /> INSTRUMENT/ SERIAL BATTERY ZEROCALIBRATION READING LEAK PERFORMED <br /> DATE MODEL NO. NO. CHECK ADJUST GAS(PPM) (PPM) CHECK BY COMMENTS <br /> OK? OK? <br /> Submit copies of logs to Director of Industrial Hygiene & Health and Safety, Philip A. Platcow, CIH within 24 hours, if a PEL is exceeded, <br /> or personal protective equipment level is upgraded at (617) 232-7355 or via email at pplatcow@secor.com <br /> PG&E SECOR International Incorporated <br /> SECOR Project No.0507.50234.00.0003 PG&E French Camp HASPB.doc <br /> 33 <br />