Laserfiche WebLink
Vicki McCartney EH <br /> From: Vicki McCartney[EHI <br /> Sent: Friday,March 28, 2008 4:21 PM <br /> To: 'Jim Barton' <br /> Subject: RE: 2774.E. French Camp Rd. Manteca Request <br /> Attachments: Revisions for Case Closure Summary and Chronology_.pdf " <br /> Revisions for Case <br /> Closure Sum... <br /> Jim: <br /> Attached please find the revisions you requested for the Chronology and the.- Case Closure <br /> Summary for Ace Tomato Company located-`at 2771 East French Camp Road, Manteca. Please let <br /> me know if you need anything else. <br /> Vicki McCartney, Senior RENS <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, California '95202 <br /> Phone: (209) 468=9852 <br /> Fax: (209) 468-3433 <br /> Email: vmccartney@sjcehd.com <br /> -----Original Message----- f <br /> From: Jim Barton [mailto:jbarton@waterboards.ca.govj <br /> Sent: Friday, March 28, 2008 7 :37 AM <br /> To: Vicki McCartney [EH] <br /> Subject: RE: 2771 E. French Camp Rd. Manteca Request <br /> Hi Vicki, <br /> Jim Munch finished his review of the closure concurrence request, and directed me to ask <br /> you to make minor modifications to the case closure summary. Please change the table on <br /> page 2 as follows: .Add "Soil Before, TBA,. 14 .5 ppm Also, the narrative mentions that <br /> the supply wells were sampled. Please add that the well water results were all non- <br /> detect. If you can email me the "2 pages with the corrections, I will replace them in the <br /> summary. Thanks. <br /> Jim Barton <br /> James L.L. Barton, P.G. <br /> Engineering Geologist <br /> California Regional Water Quality Control Board Central Valley Region, 11020 Sun Center <br /> Drive, Suite 200, Rancho Cordova, .CA 95670 office (916) 464-4615 <br /> fax (916) 464-4704 <br /> >>> "Vicki McCartney [EH] " <vmccartney@sjcehd.com> 3/27/2008 9:35 AM >>> <br /> Jim: <br /> Attached please find two pdfs. The first pdf contains a map showing where the soil <br /> samples were collected during the system upgrade in January 2004 . There is also a photo <br /> showing the excavation. I believe the excavation was limited by the surrounding concrete. <br /> Also included in the first pdf is the report titled "Preliminary Soil and Groundwater Site � <br /> Assessment" dated December 21, 2004 . ;The second paragraph of the report states that <br /> approximately 5.54 tons of soil were removed from. around the fill dispenser. The "report <br /> also shows where additional borings were advanced" in October 2004. The second pdf <br /> contains information from Kiff Analytical explaining their findings upon reviewing the <br /> chromatograms for the tour soil borings advanced in <br /> 1 . <br />