Laserfiche WebLink
OF <br /> Ace Tomato Co.,Inc. p <br /> Page 2of2 <br /> COMMENTS AND CONDITIONS: <br /> 1. Obtain a boring permit from the Environmental Health Department (EHD). <br /> 2. Analyze soil and groundwater samples for methanol and ethanol in'addition to the <br /> analyses listed above. <br /> E 3. Notify EHD at least 72 hours prior to the proposed scheduled work date. <br /> 4. A site-specific Health and Safety Plan must be submitted to EHD prior to <br /> commencement of the fieldwork. <br /> 5. Complete the fieldwork by August.20, 2004. <br /> DATED JuI39, 2004 BY <br /> cc: James L. L. Barton, CVRWQCB <br /> Richard Nickerson,Wright Environmental Services, Inc. <br /> r <br />