Laserfiche WebLink
i <br /> WDR Order No. <br /> Monitoring Well Requirements <br /> D. Well Development(not to be performed until at least 48 hours <br /> after sanitary seal placement): <br /> Method of development to be used(i.e., surge,bail, pump, <br /> Parameters to be monitored during development and record keeping technique <br /> Method of determining when development is complete <br /> Disposal of development water <br /> E. Well Survey (precision of vertical survey data shall beat least 0.01 foot): <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Datum for survey measurements <br /> List well features to be surveyed(i.e. top of casing, horizontal and vertical coordinates, etc.) <br /> F. Schedule for Completion of Work <br /> G. Appendix: Groundwater Sampling and Analysis Plan (S <br /> the workplan, and shall be utilized as <br /> The Groundwater SAP shall be included as an app <br /> endix toa guidance document that is referred to by individuals responsible for conducting groundwater <br /> monitoring and sampling activities. <br /> Provide a detailed written description of standard operating procedures for the following: <br /> Equipment to be used during sampling <br /> Equipment decontamination procedures <br /> Water level measurement procedures <br /> Well purging(include a discussion of procedures to follow if three casing volumes <br /> cannot be purged) <br /> • Monitoring and record keeping during water level measurement and well purging <br /> (include copies of record keeping logs to be used) <br /> • Purge water disposal <br /> • Analytical methods and required reporting limits <br /> Sample containers and preservatives <br /> Sampling <br /> - General sampling techniques <br /> - Record keeping during sampling(include copies of record keeping logs to be used) <br /> - QA/QC samples <br /> Chain of Custody <br /> Sample handling and transport <br /> SECTION 2 -Monitoring Well Installation Report <br /> The monitoring well installation report must provide the information listed below. In addition, the <br /> report must also clearly identify, describe, and justify any deviations from the approved workplan. <br /> A. General Information: <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions encountered during installation <br /> of the wells <br />