My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUTO CENTER
>
3333
>
2200 - Hazardous Waste Program
>
PR0514025
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 1:55:41 PM
Creation date
1/15/2020 11:39:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514025
PE
2228
FACILITY_ID
FA0009757
FACILITY_NAME
STOCKTON DODGE INC
STREET_NUMBER
3333
STREET_NAME
AUTO CENTER
STREET_TYPE
CIR
City
STOCKTON
Zip
95212
APN
12802012
CURRENT_STATUS
01
SITE_LOCATION
3333 AUTO CENTER CIR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> September 25, 2015 DEC 2 1 215 Page 2 of 5 <br /> Clean Harbors, Quote#2257419 ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> QUOTE CONDITIONS <br /> Prior to completing the cleaning of Oil stained lot, CHES field crews will perform all Health and <br /> Safety related tasks as directed by the local CHES H&S Representative and any site specific <br /> regulations pertinent to your facility. An on site safety meeting will be conducted and documented. <br /> CHES crews will set up the decon area as required, place poly sheeting around the space to be <br /> entered, and properly cordon off the site to prohibit unauthorized access. Prior to execution, our <br /> CHES crew will communicate with your on site representatives to ensure site conditions are as <br /> expected, contents of the tank are as discussed, and any system lines are blanked. <br /> After the appropriate lockout and tagouts are performed, field crews will complete the following: <br /> • Don PPE <br /> • Set up a secondary berm to catch rinsate water <br /> • Spray simple green degreaser on oil stained area with a hudson sprayer <br /> • Power wash oil stained floor capture rinsate water with a drum vac <br /> • Place rinsate water into 55gl drums provided by Safety Kleen <br /> • Safety Kleen will manifest and label waste for disposal <br /> �'4<.,faetple and 7t,chnr.&t«,y Crecrtinw a Sql�r. C'leanr;'Envir onrncnl" <br />
The URL can be used to link to this page
Your browser does not support the video tag.