My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUTO CENTER
>
3333
>
2200 - Hazardous Waste Program
>
PR0514025
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 1:55:41 PM
Creation date
1/15/2020 11:39:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514025
PE
2228
FACILITY_ID
FA0009757
FACILITY_NAME
STOCKTON DODGE INC
STREET_NUMBER
3333
STREET_NAME
AUTO CENTER
STREET_TYPE
CIR
City
STOCKTON
Zip
95212
APN
12802012
CURRENT_STATUS
01
SITE_LOCATION
3333 AUTO CENTER CIR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVE[ <br /> HAZARDOUS WASTE CONTINGENCY PLA,1� 21 2015 <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 22, California Code of Regulations(CCR)§66265.52 as referenced by§66262.34(a)(4)or 67450.3(c)(9)(C) <br /> ENVIRONMENTAL HEALTH <br /> PERkAMg7=fry/"CFS <br /> Facilities that generate 1,000 kilograms or more of hazardous waste per month, or accumulate more than 6,000 <br /> kilograms of hazardous waste on-site at any one time, must prepare a Contingency Plan. Facilities that generate <br /> in any month more than 1 kilogram of acutely hazardous waste (AHW), or more than 100 kilograms of debris <br /> resulting from the spill of an AHW, or which treat hazardous waste onsite under the Permit by Rule (PBR) <br /> onsite treatment tier must also prepare a Contingency Plan. Many facilities that are required to prepare a <br /> Contingency Plan are already subject to Hazardous Materials Business Plan (HMBP) reporting requirements due <br /> to the quantities of hazardous materiaWwastes they have onsite. If you have already prepared a Unidocs <br /> HMBP, or already have a plan which is equivalent in content to the Emergency Response/Contingency Plan <br /> module of the Unidocs HMBP, you have satisfied the Contingency Plan requirements, and are not required to <br /> complete the blank plan, below. <br /> This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br /> immediately whenever there is an imminent or actual fire, explosion, or release of hazardous waste or a <br /> hazardous waste constituent which could threaten human health and/or the environment. At least one copy of <br /> the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br /> local agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency with <br /> whom special (i.e. contractual) emergency services arrangements have been made (see Section E, below). <br /> A. Facility Information: <br /> BUSINESS NAME BUSINESS PHONE <br /> STOCKTON DODGE/HYUNDAI 209) 956 1920 <br /> SITE ADDRESS CITY ZIP CODE <br /> 3333 AUTOCENTER CIR. ISTOCKTON 195212 <br /> B. Emergency Coordinators: <br /> All personnel qualified to act as the facility's Emergency Coordinator must be listed in this plan. (Note: <br /> Emergency Coordinator responsibilities are described in Section F, below.) If more than two people are <br /> qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers of the additional <br /> qualified individuals on an attached page in the order in which they will assume responsibility as alternates, then <br /> check the box beneath the Emergency Coordinator information table, below, and indicate the list's page number <br /> in the space provided. <br /> Primary Emergency Coordinator Secondary Emergency Coordinator <br /> NAME NAME <br /> HOPE BRELAND BOB BYINGTON JR <br /> TITLE <br /> OFFICE MANAGER GENERAL MANAGER <br /> BUSINESS PHONE BUSINESS PHONE <br /> 209 9561920 (209) 9561920 <br /> 24-HOUR PHONE 24-HOUR PHONE <br /> 209 649 6893 209 727 0237 <br /> PAGER f# PAGER N <br /> ) ( ) <br /> ❑ (Check box only if applicable) Additional Emergency Coordinators are listed on page of this plan. <br /> C. Evacuation Plan: <br /> 1. The following alarm signal(s)will be used to begin evacuation of the facility (check all that apply): <br /> ❑ Bells; ❑ Horns/Sirens; X❑ Verbal (i.e., shouting); ❑Other <br /> (spec <br /> UN-017- 1/6 www.unidocs.org Rev.03/27/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.