Laserfiche WebLink
Stockton Dodge, Waste Oil & Waste Antifreeze Tank Assessment (2010) <br /> Inte rite Assessment Inspection Checklist <br /> Generallnfortnation <br /> Site_Name' TOkj Facili Cnntanct: Contact Tel No.: Date.- <br /> Site <br /> ate:Site Addre s: A Tank .ontents: <br /> titheet City: .pr Zip: <br /> 'Tank Id(if any) Gross Ca achy: Yr Installed: Tank Mfg.: Tank Model: <br /> Tank Configuration(long;.dimen.) Dimensions: <br /> Rectangular Tanks: L:_ W:_ H: <br /> ❑Horizontal ertical Cylindrical Tanks: L.en the Diatn. <br /> Secondary Containment �/� <br /> Tank: ❑ Integral DW'Tank L7Cont"nment berm ❑ Controlled Drain'Sump ❑ None <br /> ❑ C?lhcr Wcscription)____, <br /> Piping: ❑ Integral DW Piping❑Containment berm ❑ Ctr trolled Drain/Sump ❑ Nonc <br /> .I�iih ___ <br /> er(description) 'C'2 ��� <br /> Tank Primary Containment Materialel ❑ Fiberglassd_her _Wall Thickness_ <br /> Tank Secondary Containment Material ❑Steel ❑ Fiberglass 0 Cgher_ Wall Thickness._ ❑None <br /> Piping Primary Containment Material ❑Steel ❑ Fiberglass O'Uthersi-d' Diameter(in.) <br /> n <br /> Pilning Secondary Containment Materiel []Steel ❑ Fiberglass ❑ Other Diameter(in.) D Nonc <br /> 1) wriptionlComments: <br /> Other F,quipment A'06 <br /> ❑Pump.Internal(,type,size) ump.External(type,size) <br /> 111}ay'rank ODrainT'able ❑Filter Crush ❑Other err._ tronicMonitor(MfglModel) �1 <br /> Description/Comments: <br /> 7 Is Tank side Building or Covered? Leak Test or In Ilion Avail? <br /> Dwg s Available. ❑ Yerfl No <br /> Dw*N Yes❑ No O Yes No If Yes,Date <br /> Placard Labeling �� <br /> 1-1 Present ❑ No S oking Product Description t�`IlaTardous Waste <br /> 11Abscnt IW Accum Stan Date ❑ UL Std No. ❑ other <br /> Strandberg Associates 1(866) 388-0404 (650) 329-8918 rwaterguy(a)-rwaterguy.com 37 <br />