My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUTO CENTER
>
3333
>
2200 - Hazardous Waste Program
>
PR0514025
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 1:55:41 PM
Creation date
1/15/2020 11:39:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514025
PE
2228
FACILITY_ID
FA0009757
FACILITY_NAME
STOCKTON DODGE INC
STREET_NUMBER
3333
STREET_NAME
AUTO CENTER
STREET_TYPE
CIR
City
STOCKTON
Zip
95212
APN
12802012
CURRENT_STATUS
01
SITE_LOCATION
3333 AUTO CENTER CIR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Garrett Backus, <br /> I am following up on the Inspection dated 4/12/2010 EPA#CAD981967680, <br /> Page #1 - line #7 Failed to determine if a waste is a hazardous waste. *(Related to brake metal <br /> fines)* <br /> We now have a 30 gallon container properly labeled and covered as *(Hazardous Waste-Solid)* <br /> Page#1 - line #20 Failed to completely label containers or tanks of hazardous waste *(Related to <br /> Spent Absorbent)* <br /> We now have a 30 gallon container properly labeled and covered as *(Hazardous Waste— <br /> Toxic)* <br /> Page #1 — line #32 Failed to comply with new HW tank system assessment requirements <br /> *(Related to 650 gallon waste oil tank and 250 gallon waste antifreeze tanks)* <br /> We are currently working with Kleinfelder Associates (Joseph D. Zilles) regarding the proper <br /> inspection and awaiting a start date! <br /> Page #1 — line #33 Failed to provide secondary containment for HW tank *(Related to 250 gallon <br /> Waste Coolant Tank)* <br /> We have currently order and paid for the#IRM #3750T open top containment tank with 375 <br /> gallon capacity! ETA is Friday 5/14/2010—company name Ryan Process Inc. —(Don Felkins) <br /> Page#1 — line #35 Failed to conduct daily inspections of HW tank. *(Related to daily log <br /> report)*We have currently started a daily inspection along with a log book dated and signed by <br /> the shop Forman. <br /> Page #2 —line#44 Failed to: (a) prepare a contingency plan; (b) implement contingency plan <br /> We have completed and forwarded to you from *(Melvin Jones & Associates)*a new <br /> contingency plan as well as posted it here on site. <br /> I have forwarded a digital file as well as a hard copy file via email and US Mail to your attention! <br /> Please feel free to call me personally if there is any questions regarding these corrected actions. <br /> Regards, I <br /> Michael G. Curtis <br /> Service Manager <br /> Stockton Dodge / Stockton Hyundai <br /> 3333 Auto Center Circle <br /> Stockton, Ca. 95210 <br /> 209-477-3668 ext. 217 <br /> mcurtis(cDstocktondodge.corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.