Laserfiche WebLink
1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � <br /> MAJOR COMPONENTS INTEGRAL OF TRAILER MOUNTED DPE SYSTEM <br /> DISCHARGETO <br /> ATMOSPHERE <br /> I I <br /> I I <br /> I 20 HP LIQUID <br /> SOILVAPORS RING PUMP <br /> I I <br /> I 300 CFM <br /> THERMAL OXIDIZER <br /> I SAMPLE/ <br /> PRESSURE PORT <br /> O S/P (EFFLUENT) <br /> NOCKOU SAMPLE/ I <br /> TANK PRESSURE PORT <br /> GRADE (INFLUENT) Aii] <br /> GR UNDWATER I COMBUSTION AIR JNVEYS <br /> SOIOLVA ORS I <br /> B GROUNDWATER 0 2H TRANSFER PUMP L <br /> - - - - - - - - - - J <br /> ENERGIZING THE DPE <br /> CONTROL PANEL <br /> PROPANE <br /> GENERATOR <br /> TYPICALOF <br /> EXTRACTION WELLS <br /> 2HP <br /> GAC-1 GAC-2 TRANSFER <br /> HOLDING PUMP DISCHARGE TO <br /> TANK SANITARY SEWER <br /> O <br /> OW <br /> TOTALIZER SIP <br /> Ifi FLUENT MIDFLUEW EFFLUENT <br /> SAA FILE PORT SAMPLE PORT SAMPLE PORT <br /> 500-pm <br /> particulate filter 1 ,000-lbs ) <br /> GRANULAR ACTIVATED <br /> 1 ,000-lbs - CARBON VESSEL <br /> GRANULAR ACTIVATED <br /> THIS IS A PROCESS FLOW DIAGRAM, THEREFORE INSTRUMENTATION AND CARBON VESSEL <br /> CONTROL EQUIPMENT DETAILS ARE NOT SHOWN. <br /> INSTRUMENT FUNCTIONS AND INTERACTIONS ARE ALSO NOT SHOWN. <br /> EQUIPMENT SIZES ARE NOT PROPORTIONAL AND ARE NOT INDICATIVE OF <br /> FINAL SIZES. DUAL PHASE EXTRACTION SYSTEM <br /> NOT TO SCALE <br /> STi�,gTUS BARNES TRUCKING FACILITY FIGURE <br /> 1817 SOUTH FRESNO AVENUE <br /> ENVIRONMENTAL, INC. STOCKTON , CALIFORNIA 3 <br /> PROCESS FLOW DIAGRAM PROJECT NO. <br /> 2154-1817-01 <br />