Y
<br /> concentration of TPH-g (9,700 µg/L) was detected in MW-5B . MTBE was not detected by EPA
<br /> method 8260 in any of the groundwater samples analyzed.
<br /> 2000 - 2003
<br /> Beginning in June 2000, groundwater in all monitoring wells has been sampled on a calendar
<br /> quarterly basis. These sampling events took place on June 6, 2000, August 28, 2000, November
<br /> 14, 2000, February 13, 2001 , May 30, 2001 , August 22, 2001 , October 11 , 2001 , February 14,
<br /> 2002, May 10, 2002, September 30, 2002, December 4, 2002, March 5 , 2003 , and June 5, 2003 .
<br /> Reports documenting these activities have been previously submitted to the San Joaquin County
<br /> Public Heath Services Environmental Health Division by Clearwater.
<br /> 2002
<br /> A dual-phase test well and air sparge point was installed at the site in February 2002. Remedial
<br /> Ij feasibility testing at the site was conducted during the week of. March 10, 2002 . The Well
<br /> Installation and Feasibility Testing Report was submitted on May 9, 2002 . From data collected
<br /> during these activities, Clearwater developed and submitted a Corrective Action Plan dated
<br /> November 20, 2002 to the San Joaquin County Public Heath Services Environmental Health
<br /> Division .
<br /> 2004
<br /> During the third quarter of 2004, twelve remediation injection wells and an oxygen-infusion
<br /> system ("iSOC") were installed on the site. The iSOC system has increased DO in the
<br /> remediation wells from "baseline" levels of approximately 1 mg/L to concentrations on the order
<br /> of 30 mg/L . Clearwater conducted monitoring of the iSOC system, and collection of DO, ORP,
<br /> total and ferrous iron, pH, temperature, and specific conductivity measurements on a bi-weekly
<br /> basis. Clearwater performed system monitoring on a monthly basis and followed with a regular
<br /> quarterly groundwater monitoring schedule.
<br /> 2005
<br /> Clearwater conducted monitoring of the iSOC system, and collection of DO, ORP, total and
<br /> ferrous iron, pH, temperature, and specific conductivity measurements on a monthly basis .
<br /> Clearwater monitored the groundwater monitoring well network on a regular quarterly
<br /> monitoring schedule. Additional samples were collected during the third quarter groundwater
<br /> monitoring event for analysis of in-direct geochemical parameters . Microbial counts obtained
<br /> during the third quarter indicated an increase in microbial growth had occurred since the
<br /> installation and start up of the iSOC system.
<br /> 2006
<br /> Clearwater conducted monitoring of the iSOC system, and collection of DO, ORP, total and
<br /> ferrous iron, pH, temperature, and specific conductivity measurements on a monthly basis .
<br /> Clearwater monitored the groundwater monitoring well network on a regular quarterly
<br /> monitoring schedule. Additional samples were collected during the third quarter groundwater
<br /> monitoring event for analysis of in-direct geochemical parameters. Microbial counts obtained
<br /> during the third quarter indicated an increase in microbial growth, except for MW-4, had
<br /> occurred since the 2005 third quarter monitoring event.
<br /> ZB 178 - Site Investigation History 3 Updated March 2010
<br /> Barnes Trucking Facility - 1817 South Fresno Avenue, Stockton, California
<br />
|