My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:25:25 PM
Creation date
1/15/2020 2:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> M <br /> Floyd Barnes -2- October 25 , 2001 <br /> Claim No . 011828 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre-Approve Comments <br /> I Preparation of Feasibility Testing $0 Workplan has been completed <br /> Workplan <br /> 2 Quarterly Groundwater $ 133676 <br /> Monitoring 4 Events <br /> 3 Drilling, Well Installation, and $67159 Drilling, Well/Sparge Point <br /> Testing Installation, and Development (fl- <br /> inch well to 30 ft and 2-inch <br /> sparge point to 25 feet). <br /> 4 Step Drawdown, SVE, & Air $ 19,054 <br /> Sparge Tests <br /> 5 Report Preparation $22840 Prepare Well Installation Report & <br /> Results of Pilot Testing <br /> TOTAL PRE-APPROVED $41,729 <br /> * Task descriptions are the same as those identified in Clearwater Group, Inc. September 21, 2001 cost estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts, the Fund will be unable to expedite your Reimbursement Request. <br /> • e work products—mu—st be accep able to the Counted the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Clearwater Group, Inc. proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract: the State of California <br /> cannot compel you to sign any specific contract. This letter pre-approves the costs as <br /> presented in the proposal dated September 21 , 2001 by Clearwater Group, Inc. for <br /> conducting the work approved by the County for implementing the August 17, 2001 , <br /> Clearwater Group, Inc. workplan. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> CoArorms ER nronm en ts/Pro to c ti oR Agency <br /> CO Recye/edP per <br />
The URL can be used to link to this page
Your browser does not support the video tag.