Laserfiche WebLink
October 1 , 1996 <br />` Cal/EPA Floyd Barnes rete Wilson <br /> 9744 Fountain Valley Drive Governor <br /> State Water Stockton, CA 95209 <br /> Resources <br /> Control Board Re: Claim 11828 pre-approval of corrective action costs <br /> Division of Dear Mr. Barnes: <br /> Clean Water <br /> Programs <br /> I received and reviewed your bids and pre-approval documentation, dated September 10, 1996, <br /> Mailing Address: for the corrective action work at 1817 South Fresno Avenue in Stockton. I will place these <br /> P.O. Box 944212 documents in your file for future reference. <br /> Sacramento, CA <br /> 94244-2120 <br /> The pre-approval has been denied because of the lack of information required for pre-approval . <br /> 2014 T street, However, I have pre-approved Clearwater's $840.00 bid costs to prepare a workplan. Attached <br /> Suite 130 <br /> Sacramento, CA is the Fund' s cost pre-approval form, and the following is the required documentation that was <br /> 95814 lacking or comments from the pre-approval request: <br /> (916) 227-0746 <br /> FAX (916) 227-4530 <br /> • Item II.A. 1 . A complete signed copy of the investigative workplan. . . No workplan has <br /> World wide web: been submitted or prepared for the investigative work. I have pre-approved costs to <br /> hop://www:swreb.ca. developthe workplan only. <br /> gov/�cwphome/ P y. <br /> fundhome.htm Item II.A.2. A signed copy of the oversight agency approval letter.. . Please submit San <br /> Joaquin County Public Health Services, Environmental Health Division (PHS-EHD) <br /> workplan approval letter with the future bid review and pre-approval. <br /> • Item II .A.3 . A complete copy of the Request For Bids. . . Use the approved workplan and <br /> agency approval letter for the request for bid. <br /> • Item H.A.4. Complete copies of all bids. . . The three bids submitted had varying scopes <br /> of work and one bidder costs were not supplied with the pre-approval documentation. <br /> • Item 1I.A.5 . A time schedule. .. One bidder had a time schedule. <br /> • teT ATi detailed protect buu gets. One-bbidderha adefiled pio,)e�bu�get. <br /> After obtaining PHS-EHD approval of the workplan, please have the bidders prepare the bids in <br /> accordance with the Fund's pre-approval requirements and contact me for bid review and pre- <br /> approval of costs. <br /> Sincerely, <br /> t�cw <br /> Steve Marquez <br /> Water Resources Control Engineer <br /> cc: Mary Meays, San Joaquin County PHS-EHD, 304 E. Weber Ave., Third Floor, Stockton, CA <br /> 95201 -0388 (wilo attachments) <br /> Recycled Paper Our mission is to preserve and enhance the quality of California's water resources, and <br /> ensure their proper allocation and efcient use for the benefit of present and future generations. <br />