Laserfiche WebLink
S�rye4 �E45 7, $ 72 ib n 'F63 � <br /> Lisa Medina [EH] y - ss y-e1 <br /> From: Kasey Jones < kaseyjones@stratusinc.net> <br /> Sent: Wednesday, August 21, 2013 3:09 PM <br /> To: Lisa Medina [EH] <br /> Subject: DPE Pilot Test Evaluation & Summary - Barnes Trucking - 1817 Fresno Avenue, Stockton <br /> Attachments: Barnes Tucking - Site Pan.pdf, Barnes Trucking - Tables 1-6.pdf <br /> Dear Ms. Medina : <br /> As requested in your e-mail, dated July 23, 2013 , Stratus Environmental, Inc. (Stratus) has prepared <br /> the following evaluation and summary of the 5-day dual phase extraction ( DPE) pilot test conducted <br /> at the subject site on April 29, through May 3, 2013 . A site map and tables summarizing the data <br /> collected during the pilot test are attached . The following is a brief summary of the DPE pilot test <br /> fin/dings : <br /> V • Due to various reasons (sewer discharge permit requirements, generator malfunction/repair, <br /> missed propane delivery by supplier, etc.), the DPE pilot test operated for a total of 82 .4 hours <br /> during the 5-day test. On the final day/night of the test, the system operated for <br /> approximately 18 .6 hours continuously, extracting from two wells (IW-7 and IW-8) . <br /> V • An applied vacuum ranging from 22 to 22 . 5 " Fig resulted in extracted air flow rate of <br /> approximately 98 . 2 cfm (total influent air flow rates ranged from 88.4 to 98 .7 cfm, though <br /> during most of the operation, the rate was 98 . 2 cfm) . <br /> • Negligible to no induced vacuum was observed in the network of observation wells when the <br /> system operated sporadically. However, when the system operated continuously for nearly a <br /> 24-hour period (the last day of the test) on extraction wells IW-7 and IW-8, induced vacuum <br /> was observed in o servation well IW-9 up to 0 . 8-inches o water column . Given t is <br /> observation, the induced vacuum ROI was at least 25 feet, which is the distance between <br /> wells IW-7 and IW-9 . <br /> �• A maximum groundwater level drawdown of approximately 0 . 61 feet was measured in well <br /> IW-2 ( 13 feet from well MW- 10) during the initial DPE test on well MW40 . <br /> /. Approximately 19,850 gallons of groundwater was generated during the test (total up-time <br /> was 82 . 4 hours), and thus groundwater was extracted at a rate of approximately 4 gpm . <br /> • Concentrations of system influent GRO ranged from 71 mg/m3 to 380 mg/m3; these <br /> concentrations are inclusive of dilution air added to the thermal oxidizer and thus actual <br /> concentrations of contaminants extracted from the subsurface would be higher than the values <br /> reported from laboratory testing . <br /> • Influent concentrations of GRO, DRO, and benzene in groundwater ranged from < 50 mg/L to <br /> 1 ,700 mg/L, < 50 mg/L to 150 mg/L, and < 0 . 050 mg/L to 90 mg/L, respectively. <br /> 1 <br />