My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 2:47:01 PM
Creation date
1/15/2020 2:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO, R5-200X-XXXX <br /> FOR <br /> IN-SITU GROUNDWATER REMEDIATION AT SITES WITH VOLATILE ORGANIC <br /> COMPOUNDS, NITROGEN COMPOUNDS, PERCHLORATE, PESTICIDES, <br /> SEMI-VOLATILE COMPOUNDS AND/OR PETROLEUM HYDROCARBONS <br /> NOTE: THIS MONITORING AND REPORTING PROGRAM SHALL BE CUSTOMIZED TO FIT <br /> THE SITE-SPECIFIC NEEDS OF THE PROJECT. CONSTITUENTS TO BE SAMPLED, <br /> SAMPLING FREQUENCY AND REPORTING FREQUENCY NEED TO BE SPECIFIED FOR THE <br /> PROJECT, THE TABLES PROVIDE TEMPLATES AND LIKELY CONSTITUENT LISTS THAT <br /> NEED TO BE MODIFIED TO MEET THE SITE-SPECIFIC NEEDS, <br /> This Monitoring and Reporting Program (MRP) describes requirements for monitoring a groundwater <br /> extraction and treatment system. This MRP is issued pursuant to Water Code Section 13267. The <br /> Discharger shall not implement any changes to this MRP unless and until a revised MRP is issued by the <br /> Executive Officer. As appropriate, Regional Board staff shall approve specific sample station locations <br /> prior to implementation of sampling activities. <br /> i; <br /> All samples should be representative of the volume and nature of the discharge or matrix of material <br /> sampled. The time, date, and location of each grab sample shall be recorded on the sample chain of <br /> custody form. <br /> GROUNDWATER MONITORING <br /> As shown on Figure x, there are xx monitor wells, xx extraction wells, and xx injection wells/trenches <br /> associated with this site. The groundwater monitoring program for these wells and any treatment system <br /> wells installed subsequent to the issuance of this MRP, shall follow the schedule below. Monitor wells <br /> with free phase petroleum product or visible sheen shall be monitored, at a minimum, for product <br /> thickness and depth to water. The volume of extracted groundwater, if applicable, shall also be provided <br /> in quarterly monitoring reports. Sample collection and analysis shall follow standard EPA protocol. <br /> The monitor wells, extraction wells and/or injection wells shall be sampled according to the schedule in <br /> Table I and the samples analyzed by the methods in Table 2, as follows: <br /> Table 1 : Sampling Frequency and Constituent Suite <br /> Well Number' Fre uenc Constituent Suite(s s Monitoring Objective <br /> Compliance' <br /> Treatment Zones <br /> Transition Zone <br /> Back round <br />
The URL can be used to link to this page
Your browser does not support the video tag.