Laserfiche WebLink
i <br /> X In addition to the CAP/work plan that we are waiting on a final review of, there is one other issue that could be <br /> addressed in the upcoming scope of work. <br /> A few years ago, wells MW-1 through MW-4 were discontinued from the groundwater monitoring and sampling <br /> program . I was thinking about saving one of these wells ( maybe MW-2 ) for the Notice of Intent permit as a 'background <br /> well' or something similar, however the other three wells (presumably MW-1, MW-3, MW-4) could probably be <br /> destroyed during the same drilling mobilization as the installation of the ozone injection wells, assuming you approve <br /> the CAP/Work Plan . <br /> If you would, when you prepare a directive letter, could you comment on this as well? <br /> Scott <br /> 2 <br />