Laserfiche WebLink
=> <br /> CLEARWATER <br /> G R O U P <br /> F.vreo—ental Services <br /> FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3. Groundwater Elevation Contour Map (March 8, 2006) <br /> Figure 4 Dissolved-Phase Benzene Iso-Contour Map (March 8, 2006) <br /> Figure 5 Dissolved-Phase TPHg Iso-Contour Map (March 8, 2006) <br /> Figure 6 MW-1 TPHg and Benzene vs Time <br /> Figure 7 MW-5B TPHg and Benzene vs Tune <br /> Figure 8 MW-8 TPHG and Benzene vs time <br /> Figure 9 iSOCTM System Trench Locations <br /> Figure 10 Dissolved Oxygen Levels in Groundwater Monitoring Wells <br /> Figure 11 Dissolved Oxygen Levels m iSOCTM System Wells <br /> Figure 12 Dissolved Oxygen Iso-Contour Map (March 8, 2006) <br /> TABLES <br /> Table 1 Well Construction Data <br /> Table 2 Groundwater Elevation and Sample Analytical Results <br /> Table 3 Field Measured Geochemacal Data <br />. ATTACHMENTS <br /> Attachment A Site Investigation History <br /> Attachment B Clearwater Field Protocols for Groundwater Sampling and Monitoring Natural <br /> Attenuation(includes MNA Tables 1 -3) <br /> Attachment C Gauge Data/Purge Calculations and Purge Data Field Log Sheets <br /> Attachment D Kiff Analytical LLC Laboratory Report #48793 <br /> Attachment E ISOCTM System Field Monitoring Data Forms <br /> cc Mr Floes es, Barnes Trucking, 9744 Fountain Valley Drive, Stockton, CA 95209 <br /> Mr. James L. Barton, R G , Central Valley Regional Water Quality Control Board, 11020 <br /> Sun Center Dr , #200, Rancho Cordova, CA 95670-6114 <br /> ZB178I 10 of 10 May 2006 <br />