Laserfiche WebLink
.t <br /> Clearwater Group <br /> ISOC SYSTEM FIELD MONITORING DATA PAGE 1 <br /> CLIENT Floyd Barnes , <br /> PROJECT NAME Barnes Trucking Date 2/7/2006 _ <br /> PROJECT NUMBER ZB178H - — - TECHNICIAN RB_IEA <br /> Project Manager Jessica Chiaro <br /> SYSTEM DESCRIPTION JUTILITIES <br /> 1nVentures ISOC system lOxygen Cylinder <br /> Initial install I I [ X Routine maintenance <br /> ARRIVAL TIME IDEPARTURE TIM <br /> Arrival System On Y ) Time j Departure System On (Y/ ) <br /> Oxygen Cylinder ON,,?, es / Nc Oxygen Cylinder ON? e / N <br /> Tank Pressure si Tank Pressure psi <br /> Line Pressure si Line Pressure psi <br /> Before Adjustment of Guages After Adjustment of Guages <br /> ISOC(Iw-1) ISOCIw-1 <br /> Inlet Pressure Psi I Inlet Pressure 61, psi <br /> Flow Rate cc/min Flow Rate Z &7 cc/min <br /> Well Pressure psl Well Pressure psi <br /> ISOC(IW-2) ISOC(1W-2) N <br /> Inlet Pressure psi Inlet Pressure si <br /> Flow Rate cc/min <br /> Well Pressure psi Well Pressure PSI <br /> ISOC(IW,3) ISOC Iwo . <br /> Inlet Pressure si Inlet Pressure si <br /> Flow Rate cc I min Flow Rate L' CC/min <br /> Well Pressure si Well Pressure psi <br /> ISOC(IW-4)- _ _ _ _.w M _ ISOC IW-4) <br /> Inlet Pressure si Inlet Pressure _ si - <br /> Flow Rate CC/min Flow Rate cc/min <br /> Well Pressure Dsl Well Pressure psi <br /> WELL DATA WELL DATA " <br /> Well #1 DTB DTW ST DO ORP FE FE2+ PH TEMP 1COND' I 0,-4o4 e <br /> IW-1 2472 11- 01 q <br /> IW-2 2392 ,/ L <br /> IW-3 2465 / , ?i <br /> IW-4 22 96 <br /> AL,75C <br /> MAIN TENANCEIDATA COLLECTION CHECKLIST(Check Items Completed) <br /> Item I Check Descriptlon Schedule <br /> Oxygen Cylinder 1 51 /o full every visit <br /> ISOCControl Panel every visit <br /> J <br /> Housekeeping - every visit <br /> Other Maintenance Performed Sample check <br /> Conductivity Meter Used Settingstunits Reported <br /> Notes <br /> DTB Depth to Bottom ST Saturated Thickness(DTB DTW) <br /> DTW Depth to Water <br />