Laserfiche WebLink
Clearwater Group <br /> ISOC SYSTEM FIELD MONITORING DATA PAGE 3 <br /> CLIENT Floyd Barnes <br /> PROJECT NAME Barnes Trucking Date 2/7/2006 <br /> PROJECT NUMBER - - ZB178H - TECHNICIAN RBIEA <br /> Project Manager Jessica Chiaro <br /> SYSTEM DESCRIPTION JUTILITIES <br /> InVentures ISOC system IOxygen Cylinder - <br /> Initial install[ ] L X I Routine maintenance <br /> ARRIVAL TIME-\ IDEPARTURE TIME <br /> Arrival System On N) Time-&) IDeparture System On? /N) <br /> Oxygen Cylinder ON Yes 1 Nc Oxygen Cylinder ON? IYes / No <br /> Tank Pressurepsi Tank Pressure psi <br /> Line Pressure psi Line Pressurepsi <br /> Before Adjustment of Guages After Ad usti of Gua es <br /> ISOC(IW-s) ISOC(IW-9) <br /> Inlet Pressure si Inlet Pressure Si _ <br /> Flow Rate cc 1 min Flow Rate e2 cc I min <br /> Well Pressure psi Well Pressure psi <br /> ISOC(IW-10) ISOC(IW-10) - <br /> Inlet Pressure Psi Inlet Pressure Ca psi <br /> Flow Rate - cc/min Ftow Rate D cc 1 min <br /> Well Pressures ^Si 6'L`eli I-'r855urB psi <br /> ISOC(IW-11) ISOC(IW-11) <br /> Inlet Pressure psi Inlet Pressure psi <br /> Flow Rate cc 1 min IFlow Rate U cc I ruin <br /> Well Pressure si Well Pressure <br /> SI <br /> -T ISOC(IW-12) T ISOC IW-12 - <br /> Inlet Pressure DS1 Inlet Pressure �psi <br /> Flow Rate - - cc 1 min Flow Rate cc/min <br /> Well Pressure psi Well Pressure Psi <br /> WELL DATA WELL DATA <br /> Well # DTB DTW ST DO ORP FE E2+ PH TEMP COND <br /> IW-9 2473 F, 75` a <br /> IWA0 2456 <br /> IW-11 475f-,,� . '�.IW-12SVE-1Mw-sB - <br /> MAINTENANCE/DATA COLLECTION CHECKLIST(Check Items Completed} <br /> Item Check Description Schedule <br /> Oxygen Cylinder t )ps1 A2% full eve visit <br /> ISOC Control Panel eve visit <br /> Housekeeping every visit <br /> Other Maintenance Performed Sample check <br /> Conductivity Meter Used SettingslUnits Re orted <br /> l+fotes <br /> DTB Depth to Bottom ST Saturated Thickness(DTB-DTW) <br /> DTW Depth to Water <br />