Laserfiche WebLink
Clearwater Group <br /> ISOC SYSTEM FIELD MONITORING DATA PAGE 3 <br /> CLIENT Floyd Barnes <br /> PROJECT NAME - Barnes Trucking Date W12006 <br /> PROJECT NUMBER ZB178H TECHNICIAN RBIEA _ <br /> Project Manager Jessica Chiaro <br /> SYSTEM DESCRIPTION UTILITIES <br /> InVentures ISOC system -- 104W Cinder <br /> Initial install[ ] X Routine maintenance <br /> ARRIVAL TIME IDEPARTURE TIME <br /> Arrival System On?(YIN) Time Departure System On N} <br /> Oxygen Cylinder ON T e5 / Nc Oxygen tinder ON? Yes / N <br /> Tank Pressure i lank Pressure r <br /> Line Pressure psi Lfne Pressure I psi <br /> Before Adjustment of Guages After Ad ustrnent of Gua es <br /> ISOC IW-9 tS0C(IW-9 <br /> Inlet Pressure psi Inlet Pressure 2. si <br /> Flow Rate cc/min Flow Rate 7 cc/min <br /> Welt Pressure s Well Pressure psi <br /> Isoc{Iw-10} ISOCROV-10) _ <br /> Inlet Pressure s psi Inlet Pressure psi <br /> Flow Rate cc/min Flow Rate cc/min <br /> Well Pressure psi Well Pressure r <br /> lSOC(iW-11 ISOC(iW-11) <br /> Inlet Pressure psi Inlet Pressure psi <br /> Flow Rate ( cc/min Flow Rate cc/min <br /> Well Pressure psi Well Pressure psi <br /> ISOC IW-12 ISOC(IW-12 <br /> Inlet Pressure psi Inlet Pressure psi <br /> Ftow Rate cc/min Flow Rate cc/min <br /> Well Pressure Psi Well Pressure psi <br /> WELL DATA WELL DATA <br /> Well # 1 DTB I DTW ST DO ORP FE I FE2+ PH TEMP COND" <br /> IW-9 24.73 C 0.4 7 c p `! <br /> IVY-10 24 56 G pc - G G 61 C 7 t 1 c <br /> IW-11 24.75 5 5e, -13`f I '? - 6 G F lS <br /> [W-12 247 q(, o 46.1 C 1 <br /> SVE-1 !i <br /> MW-se <br /> MAINTENANCEIDATA COLLECTION CHECKLIST(Check Items Completed) <br /> Item Check Descrl on Schedule <br /> Ox en Cylinder 0 psi Vmr % full every visit <br /> ISOC Control Panel every visit <br /> Housekeeping every visit <br /> Maintenance Performed Sam ie check <br /> b � <br /> Notes otedonducttvi Meter Used 5ettin s1UnitsRe r <br /> N <br /> DTB Depth to Bottom ST Saturated Thickness(DTB-DTW) <br />