My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002453
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:52:38 PM
Creation date
1/15/2020 2:47:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002453
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> add <br /> CLEARWATER <br /> G R O U P I N C <br />�I Envtrv..e til S—ge— <br /> entered the sample in addition to those in the dissolved state, and may explain the increased <br /> contaminant concentrations <br /> PROJECT STATUS AND RECOMMENDATIONS <br /> Clearwater recommends continuation of groundwater monitoring contaminant concentration in <br /> wells MW-1 through MW-8 to confirm results reported herein and to determine contaminant <br /> concentration and distribution trends over the near future Clearwater recently received approval <br /> from the San Joaquin County Environmental Health Department (SJC/EHD) to implement the <br /> proposed Corrective Action Plan for enhanced bioremediation using an oxygen-infusion system <br /> Clearwater is currently preparing a Remedial Action Plan for oxygen-infusion system design, <br /> permitting, installation, and start-up Further monitoring for monitored natural attenuation <br /> (MNA) parameters will be performed prior to start-up of the oxygen-infusion system, and <br /> periodically thereafter while the oxygen-infusion system is operated <br /> ZB178C/1stQtr2004 Monitoring Rpt 9 April 15, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.