Laserfiche WebLink
Y fl <br /> �V k <br /> CLEA �IGIGZATER <br /> • G R U P <br /> O <br /> Enaeronmenral Serwces <br /> Remarks MTBE was detected by EPA 8020 in the groundwater sample collected from morutormg wells <br /> this quarter Previously,MTBE has been confirmed as "non-detectable"by EPA 8260B in all monitoring <br /> wells sampled at the site <br /> PROJECT STATUS&RECOMMENDATIONS <br /> The contaminant plume is currently delineated and being monitored on a quarterly basis <br /> Clearwater recommends preparation of a Corrective Action Plan This plan will present cumulative <br /> site data, contaminant mass calculations and recommendations on remedial actions <br /> ATTACHMENTS <br /> • Site Vicinity Map (Figure 1) <br /> • Site Plan (Figure 2) <br /> • Groundwater Contour Map-5/30/01(Figure 3) <br /> • Hydrocarbon Distribution Map-5/30/01 (Figure 4) <br /> • Groundwater Elevations and Analytical Results (Table 1) <br /> • Clearwater Gauging Data/Purge Calculations and Well Purging Data <br /> • Certified Laboratory Reports and Cham-of-Custody Form <br /> • Clearwater Groundwater Monitoring and Sampling Protocols <br /> ZB17 -2QT0 1 3 June 8, 2001 <br /> 8C <br />