Laserfiche WebLink
C_L_E__A__,* <br /> RW-ATER <br /> In January 1999, Clearwater supervised the installation of three additional grow nd«ater monitoring <br /> wells (MW-4 through MW-6) to delineate the extent of dissol-,ed-phase contamination The results of <br /> the investigation indicated that the extent of sorbed-phase contamination v,,as delineated and existed <br /> from approximately 10 to 25 feet bgs near the former USTs Results of the grog-mdwater samples <br /> indicated that the extent of dissolved-phase contamination remained undelineated don%ngradient from <br /> the former UST systern However, high contaminant concentrations in cross-gradient position of wells <br /> suggested that off-site sources may be contributing to contamination detected beneath the site Initial <br /> inquiries suggest that there may be a former or etisting fuel transport lane in the area if the site Based <br /> on these results, Clearwater recommended additional investigation along South Fresno A-�enue to better <br /> understand the distribution of contamination and possible contribution trom potential off-sate sources <br /> The results of this phase of investigation were presented in Clear.iters Well hit 4allation and <br /> Grozordwater Mo)ritoring Report - Fo st Quartet 1999 <br /> GROUNDWATER MONITORING AND SAMPLING ACTIVITIES <br /> Date of ground-,-,ater sampling December 14, 1999 <br /> Wells gauged MW-1 through MW-4, and MW-b <br /> Wells purged and sampled MW-1 through MW-4, and MW-6 _ <br /> Analytes tested TPHg/BTEX/MTBE (EPA Method S015NI/8020) <br /> Laboratory Entech Analvtical Labs, (Sunn<<ale, CA) <br />• Remarks None <br /> GROUNDWATER MONITORING AND SAMPLING RESULTS <br /> Depth to groundwater 9 97 to 10 53 feet below top of casing <br /> Flow direction Southeast at 0 0012 ft/ft <br /> TPHg concentration range 63 gg/L (MW-2) to 9,900µg/L (1IW-1) <br /> Benzene concentration range <0 50 µg/l_ (MW-2,MW-4) to 560 ug/L (MW-1) <br /> MTBE concentration range <5 0 µg/L (MW-2, MW-4, MW-6) to 83 µg/l_ (MW-1) <br /> Remarks During recent paving and construction activities on-site, both MW-2 and MW-5 were <br /> damaged The well box and top of casing of MW-2 were damaged, so the depth to water in this well <br /> was not used in calculating a groundwater elevation MW-5 was damaged beyond repair and will <br /> require proper abandonment and re-installation Once MW-5 as re-installed, all the wells will be re- <br /> surveyed prior to the next monitoring event MTBE was detected by EPA 8020 in groundwater samples <br /> collected this quarter Previously MTBE has been confirmed as "non-detectable"by EPA 8260 <br /> PROJECT STATUS&RECOMMENDATIONS <br /> The EHD responded to Clearwater's Well Installation and Groundwater Monitoring Report - First <br /> Quarter 1999 in a letter dated Jame 25, 1999 The EHD concurred n%ath the recommendations for <br /> additional assessment of groundwater contamination downgradient or the former UST system A <br />• workplan to complete the lateral and vertical delineation of the contaminant plume has been approved <br /> CGI C-178 4Q99 2 Decerrber 28,1999 <br />