Laserfiche WebLink
Barnes Trucking Facility i <br /> Driveway <br /> I � <br /> I r-7 <br /> I Garage <br /> Concrete I <br /> I <br /> Office z <br /> MW-6 O <br /> MW-2 (9 52) <br /> I (N/A) MW-1 / M <br /> (9 62) Z <br /> Driveway <br /> California MW-3 / <br /> Water (9 62) <br /> Service ,�W_4 MW-5 <br /> Company ; a 9.60 S(9 59) 9.55 <br /> I= 0 0025 ft/ft <br /> o I <br /> V <br /> Iw <br /> EXPLANATION <br /> U Former UST Excavation <br /> Former Fuel Dispensers <br /> I <br /> Monitoring well <br /> MW-1 <br /> 0 Soil Boring <br /> SB-2 <br /> 9 60 Groundwater Elevation <br /> N o 50 ion and Contour <br /> ,=0 0025 ft/ft Approximate Groundwater <br /> APPROXIMATE SCALE IN FEET Y\ Flow Direction and Gradient <br /> GROUNDWATER ELEVATION CONTOUR <br /> MAP - 9/21/99 CLEARWATER GROUP, INC <br /> Barnes Trucking Facility <br /> 1817 South Fresno Avenue Project No Figure Date Figure <br /> Stockton, California C-178 10/99 3 <br />