Laserfiche WebLink
CLEARWATER <br /> GROLP I A C <br /> • Enscronmentu! Sern:ces <br /> requested by the EHD a new workplan for further delineation of the contaminant plume and well <br /> rehabilitation at MW-5 will be submitted shortly under separate cover <br /> ATTACHMENTS <br /> • Site Vicinity Map (Figure 1) <br /> • Site Plan (Figure 2) <br /> • Groundwater Contour Map-6/21/99 (Figure 3) <br /> • Hydrocarbon Distribution Map-6/21/99 (Figure 4) <br /> • Groundwater Elevations and Analytical Results (Table 1) <br /> • Clearwater Gauging Data/Purge Calculations and Well Purging Data <br /> • Certified Laboratory Reports, Chromatograms, and Chain-of-Custody Form <br /> • Clearwater Groundwater Monitoring and Sampling Protocols <br /> CERTIFICATION <br /> This report was prepared under the supervision of professional Registered Geologist in the state of <br /> California All statements, conclusions and recommendations are based solely upon published results <br /> from previous consultants,and field observations by Clearwater Group, Inc <br /> Information and interpretation presented herein are for the sole use of the client The information and <br /> • interpretation contained in this document should not be relied upon by a third party <br /> The service performed by Clearwater Group, Inc has been conducted in a manner consistent with the <br /> level of care and skill ordinarily exercised by members of our profession currently practicing under <br /> similar conditions No other warranty, expressed or implied, is made <br /> Prepared by <br /> c <br /> Benjamin Pink <br /> Staff Geologist <br /> Reviewed by ST) GFO{ <br /> Mfu <br /> 4r 505 -4 <br /> `6 2q <br /> Brian Gwunn,R G <br /> Senior Geologist <br /> CGT C-178 2Q99 3 August 24, 1999 <br />