Laserfiche WebLink
0 <br /> BARNES TRUCKING FACILITY I-`— <br /> POLE <br /> DRNEIYAY <br /> rl Q <br /> � I <br /> MW-2 <br /> (1071) z <br /> 1070 <br /> O <br /> GARAGE I <br /> OFFICE C <br /> z <br /> MW-1 C' <br /> CONCRETE PAD (10 40) DRIVEWAY t <br /> GROUNDWATERFLOW 1030 <br /> I <br /> DIRECTION 6,GRADIENT ® - <br /> I MW-3 <br /> (10 34) CONCRETE PAD <br /> 1 i <br /> I <br /> I <br /> . I <br /> I <br /> i <br /> EXPLANATION <br /> FORMER UST EXCAVATION <br /> k FORMER FUEL DISPENSERS <br /> {III <br /> MONITORING WELL <br /> MW-1 <br /> GROUNDWATER ELEVATION <br /> (10 34) (FEET REFERENCED TO PROJECT DATUM) <br /> N 0 50 100 GROUNDWACONTOUR(F�ELEVATION <br /> 1030 <br /> APPR0>MAATE SCALE IN FEET <br /> GROUNDWATER CONTOUR MAP - 9129198 CLEARWATER GROUP, INC <br /> Barnes Trucking Facility <br /> 1817 South Fresno Avenue Project No Figure Date Figure <br /> Stockton, California C-178 10198 3 <br />