Laserfiche WebLink
r BARNES TRUCKING FACILITY I <br /> 1 <br /> 1 Driveway <br /> I <br /> I � <br /> 1 I <br /> I � <br /> I rl 1 0 <br /> I LI I <br /> 1 I x <br /> I Garage l <br /> I � <br /> Above-ground 1 SB-5OU WI <br /> storage tank I 83) I 0 <br /> (bermed) I / 0 <br /> I I <br /> SB-3 Ce <br /> M <br /> ' 0 Z <br /> I Driveway <br /> I 8.40 � SB-1 41 <br /> Concrete Pad ' (8 22} - <br /> / _ a <br /> 1 8.30 MW-3 1 <br /> w <br /> a I <br /> (82700000roncrete Pad <br /> I 8.20 <br /> I I <br /> I I <br /> I I <br /> E <br /> EXPLANATION <br /> Former UST Excavation (8 22) Groundwater Elevation <br /> (Referenced to Project <br /> Datum)-In Feet <br /> Former Fuel Dispensers <br /> ! Groundwater Elevation <br /> Monitoring well Contour-In Feet <br /> MW-1 N <br /> location 820 <br /> 0 Soil boring p Approximate Groundwater <br /> location Flow Direct-ion 100 <br /> SB-1 Gradient=0 003 ft/ft 0 50 <br /> Approxunate Scale <br /> 1 inch=50 feet <br /> • GROUNDWATER CONTOUR MAP CLEARWATER GROUP, INC <br /> SEPTEMBER 29, 1997 <br /> Barnes Trucking Facility <br /> 1817 South Fresno Avenue Project No Figure Date Figure <br /> Stockton, California C-178 6/97 4 <br />