Laserfiche WebLink
1.0 PURPOSE <br /> This Site Safety Plan (SSP) establishes the basic safety guidelines and requirements for the above scope(s) of work <br /> at the above site (see Site Location Map-Figure 1) This SSP addresses the expected potential hazards that may be <br /> encountered during this project <br /> The provisions set-forth in this SSP will apply to Clearwater Group, Inc (Clearwater) employees and any <br /> subcontractors working for Clearwater at the job site All personnel working for Clearwater, including <br /> subcontractors,at the job site must read this SSP,and sign the attached Compliance Agreement(Appendix A)before <br /> entering the work area <br /> 2.0 FACILITY BACKGROUND <br /> 2.1 Site Layout and History (Site location is shown on Fig 1, site map on Fig 2) <br /> Previous Site Operations From, To. _ <br /> From;____ T o. <br /> Is site currently activeses No <br /> Work surface is Asphalt Concre Gravel/Dirt <br /> ASTs/USTs presents Yes o Location <br /> Number of USTs removed Location, Date removed��Z- <br /> 2.2 Soil Contamination <LcL5 <br /> • Maximum benzene concentration in soil.Location <br /> Maximum TPH concentration in soil. LocatiorL Y�-�1Y_ r� r S70-0 d°¢y <br /> 2.3 Ground Water Wells and Contamination <br /> Number of monitoring wells at the site <br /> Maximum dissolved benzene concentration to date Well. <br /> Latest maximum dissolved benzene concentration Well <br /> 2.4 Remediation <br /> Previous remedial system operation Froni To <br /> From To <br /> Active remediatioli J, <br /> Number of SVE wei15 AS well5L GWE wells <br /> Other (trenches, sumps, ) <br /> Remediation equipment on site <br /> SSP 1 September 22 1997 <br />