Laserfiche WebLink
CILEAIaz WE <br /> R <br /> GROUP , INC <br /> FIELDWORK REQUEST FORM <br /> Project Number: ZB178C Client Number: 500 <br /> Protect Location: Stockton Project Name: Barnes Trucking <br /> Project Address: 1817 South Fresno Ave , Stockton, CA <br /> FRF Date: Fnda , May 16, 2003 <br /> Protect Manager: Brian Pierskalla (510) 307-9943 ext 231, or(925) 351-7474 (cell) <br /> Call & check in with manager during work. <br /> Type of Field Work: Quarterly groundwater monitoring of 8 wells - <br /> Date Scheduled: 5-Jun-03 <br /> Field Geologist(s): Scott Robertson/Jessica Cluaro/Rodne Be <br /> Task Details: Please PIU YSI Meter at Equipco Evening Before <br /> Task 1 Remove all well caps an allow water level to equalize prior to gauging <br /> Task 2 Gauge Wells in this order MW-2, 3, 4, 8, 7, 6, 1, 5B <br /> Task 3 Purge Wells to Same Order as Above <br /> Task 4 Sample Each Well in Same Order as Above, Careful not to Aerate Water Coluinrl <br /> Task 5 Collect Extra Sample Water from MW-4, 8, 1, 5B 2 x 125ml, and 1 x 250 ml Poly <br /> • Task 6 Filter water for Ferrous (Fe++) Sample <br /> Task 7 Collect Extra Sample Water from MW-1, 4, 5BWx 250 nil Poly Acid Preserved <br /> Task 8 Complete Temp, DO, pH, Conductivity, Eli with YSI meter after each well <br /> Task 9 Report into Randal @ C toculture after sampling 561) 762-5440 cell. <br /> Task## Rate Task Description Hours Assigned Hours Used <br /> 2036 $60 Field Prep 1 ��qL <br /> 2290 $60 Travel 4 civ <br /> 2240 $60 Water Sampling 8 <br /> Lab: JKiff Analytical 530) 297-4800 Call in Pick-u <br /> Analyses,Bottle Requirements & COC Information: Bottles Preservative <br /> TPH GasohneBTEX/MTBE by EPA Method 8260 3 VOAs HC1 <br /> Standard turn-around time <br /> Cytoculture MW-1, MW-4, MW-5B# Mui-9' 2 x 125 ml Poly None <br /> (see COC by BP) 1 x 250 ml Poly None <br /> Include the following numbers in the COC: Sampling Company Log Code- CWGO <br /> Global 1D #I: 70607700585 Purchase Order 0: <br /> Attachments: Tables Site Map Other H&S Plan <br /> X X <br /> Comments: <br /> • This Field Request Form and all its attachments, your Field Notes, and the Field Equipment <br /> & Material Billing sheet should be completed and submitted to the Protect Manager within <br /> 2 days of the job being completed. <br />