Laserfiche WebLink
C LEAR-WATER <br /> c R o u r <br /> Enanonnerrt ta! Seraecrs ISI <br /> ATTACHMENTS <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Groundwater Elevation Contour Map---3/5/03 <br /> Figure 4 Dissolved-Phase Hydrocarbon Distribution Map (Groundwater)— 3/5/03 <br /> Figure 5 Dissolved-Oxygen Distribution Map—3/5/03 <br /> Figure 6A Empirical First Order Decay MW-1 TPHg and Benzene vs Time <br /> Figure 6B Empirical First Order Decay MW4 TPHg and Benzene vs Time <br /> Figure 6C Empirical First Order Decay MW-5B TPHg and Benzene vs Time <br /> Figure 7 Intrinsic Bioremediation Indicator Map— 3/5/03 <br /> Table I Groundwater Elevations and Sample Analytical Results <br /> Table 2 Intrinsic Bioremediation Data <br /> Table 3 Well Construction Data <br /> Appendix A Groundwater Monitoring and Sampling Procedures & Natural Attenuation <br /> Processes and Recommended Monitoring Guidelines <br /> Appendix B Field Notes, Purge Calculation Data Sheet & Well Stabilization Data <br /> Appendix C Laboratory Analytical Reports Including Chain of Custody Records <br /> ZB178C/1Q03 Monitoring Rpt 12 April 23,2003 <br />