My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002480
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:14:00 PM
Creation date
1/15/2020 3:04:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002480
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />' Why use the iSOCTM Control Panel? <br /> 1�t Design based on actual Installation and operation experience of remediation contractors <br />' e? Specially designed components eliminate typical system Installation, start up and <br /> operation problems, provided lSOCTm User Guide instructions followed <br /> High quality construction <br /> D? Pressure tested from the manufacturer <br />' Q? Uses only oxygen cleaned components <br /> D? All gas compatible components <br /> L? Allows the iSOCTM to be hung at different depths in the groundwater while maintaining <br />' roper control of all units <br /> ti Costs less time and money than It takes to source, assemble and pressure test oxygen <br /> cleaned and gas compatible components <br /> 1�? Allows for rapid Installation and easy operation of the WCsTm <br />' L? inVentures Technologies warrants the performance of the iSOCTM when ISOCTM and the <br /> WCTM Control Panel are used together <br />' What does an iSOCTM System Look Like? <br /> it >C'C 41:tfYf.�j!ai'.. <br /> I s 9 <br /> = P2 iSOC Pressure Gauge <br /> Low Flow Gas <br /> I <br /> Flowmeter <br /> Fl owmeterBypass Line <br /> Gas Inlets <br /> Pressureauge <br /> Bypass line f�,v1 <br /> Button Valve <br /> I Gas Flow Canty- M Gas <br /> Poyflow Gas Adjustment Valve Regulator <br /> Line to iSOC w <br /> 1,5 <br />' <br /> Gas Inlet Panel <br /> iSOC Gas Outlet <br /> Connection Gas Cylinder Nel <br /> Panel Connection Valve <br /> Well <br /> JG oundwater '`aMaximomWater DepthSOC <br /> (iSOC Head} <br /> Gas <br /> ICylinder <br /> rSOCTm Equipment Setup Schematic <br /> IHow much does rSOCTm and the Control Panel Cost? <br /> The iSOCTm groundwater remediation technology is the leading and most cost effective <br /> Isolution in the marketplace today <br /> . Some state trust funds will not reimburse a capital purchase but will reimburse a rental charge <br /> plus consultant's Installation and operation costs — rSOCsTm are available to rent for these <br />' situations <br /> Please contact your area representative for prices - www.gasinfusion.com <br /> Jim Jacobs, iSOC Rep rSOCTm Brochure v 02 08-Page 4 <br />' Environmental Bio-Systems, Inc <br /> 415-381-5195, augerpro@jps net <br />
The URL can be used to link to this page
Your browser does not support the video tag.