Laserfiche WebLink
CLEARWATER <br />' c R o v P <br /> �� Errar rannernlal Servrcrs <br /> 1 <br />' 7.0 PROPOSED CORRECTIVE ACTION SCHEDULE <br />' 7.1 Purpose <br /> The following section identifies key activities to be completed toward the path of soil and <br /> groundwater remediation at the site In order to gather data to design the appropriate iSOC <br /> system, pilot testing must be performed first <br /> 7.2 Proposed Schedule <br /> Key activities and dates associated with the proposed corrective action are identified below <br /> I <br /> Activity Timeline <br /> / CAP subrrntted to SJCEHD November 20 ,2002 <br /> I SJCEHD a2proval of CAP SJCEHD CAP approval <br /> lie4Q02 groundwater monitonng December,2002 <br /> l Q03 groundwater momtonn erform RNA pilot testing) March, 2003 <br /> W Submit RAP for 1SOC system based o clot testhn 90 days after SJCEHD CAP approval <br /> z. <br /> Be m installation and start-up iSOC s -stern 120 days after SJCEHD CAP approval <br /> I2Q03 groundwater monitoring June, 2003 <br /> The schedule presents target dates for completion of key activities related to the preferred <br /> remedial option However, it should be noted that if pilot test results suggest enhanced <br /> bioremediation will not be an effective remedial solution for the site, other alternatives will be <br /> considered at that time, and the remedial schedule will change as a result <br /> I 7.3 Groundwater Monitoring Schedule <br /> In order to gather important hydrogeologic and water quality data, Clearwater recommends the <br /> quarterly groundwater monitoring program continue to run through the end of 2003 and be <br /> expanded to include natural attenuation parameters (eg Dissolved oxygen, reduction potential, <br /> etc , see section 7 4 below for more detail) The need for continued adherence to the schedule <br /> will be re-evaluated after the end of the year <br /> I <br /> ZB 178C CAP 20 November 20,2002 <br />